&mcom
WARNING
Improper installation of the JAMMA harness
connector to the game cartridge will cause
damage to the enclosed PCB.
25.
Power-up the game and set all operator
adjustable options by pressing the
TEST
switch.
Follow the instructions under the TEST MENU
section of this manual.
"B" KIT INSTALLATION
1.
To install the cabinet graphics, you must
follow the "FULL" Kit Preparation and Installation
Procedure, steps 3 through 14.
2.
To remove the existing "B" cartridge from
the "A" cartridge, pull the old case clamps apart
(see Figure 12). Carefully remove the old "B"
cartridge and install the new "B' cartridge.
Re-install the case clamps.
STREET FIGHTER
™ :
ALPHA 2
] \
WARNING
DISASSEMBLY OF EITHER GAME
CARTRIDGE WILL VOID YOUR
WARRANTY.
3. Power-up the game and set all operator
adjustable options by pressing the
TEST
switch.
Follow the instructions under the TEST MENU
section of this manual.
Proprietary and confidential information, not to be disclosed or copied without the express permission of CAPCOM® COIN-OP, INC.j
7
Need help?
Do you have a question about the Street Fighter Alpha 2 and is the answer not in the manual?
Questions and answers