Power-On Startup; Check Before Power-On - 3Com S7906E Getting Started Manual

S7900e family
Hide thumbs Also See for S7906E:
Table of Contents

Advertisement

Figure 4-6 Set terminal emulation in the property setting window

Power-On Startup

Check before Power-On

Before powering on an Ethernet Switch, check if:
The switch has been mounted steadily.
All the cards have been correctly installed.
All the communication cables, fibers, power cables, and grounding cables have been correctly
connected.
If the voltage of power supply can meet the requirements on the switch.
The console cable has been correctly connected. The computer or terminal for configuration has
been started and the terminal parameter settings have been done.
Before powering on the switch, make sure where the power switch of the equipment room is located, so
that you will be able to power off when meeting accidence.
Power-On
Turn on the power supply of the switch.
4-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

S7910eS7906e-vS7903eS7903e-sS7902e

Table of Contents