Installation Guide - Haier HW-07LF03 Operation Manual

Window type room air conditioner
Table of Contents

Advertisement

Installation Guide

Installation of air-conditioner
1. Make the wall hole or window hole (see Fig.1) .
2. Fix the prefabricated iron frame to stable
position by expansible screws.
3.Take out the conditioner and accessories
from the package .
Cooling-only type air-conditioner: before dispatched
4.
from the factory, the drip hole at the bottom plate
has been blocked by rubber lid in the accessories.
If the surrounding humidity is high, should assemble
drainage bend in the drainage hole at the back of
bottom plate and connect the drainage tube as
illustrated in Fig. 3. If the user doesn't need to
retain the condensate in the bottom plate, can
remove the rubber lid on the bottom and as
illustrated in Fig. 2, assemble the attached drain
pan on the bottom of the air-conditioner, and connect
drainage tube at the water outlet hole on the drain
pan.
5. If you need to lead the condensed water to
indicated position, please purchase a piece
of plastic pipe , set it on the outlet pipe fitting
and tie it tightly.
6. After installation of all the accessories, put
the whole machine on the iron frame. If
there's water outlet flexible pipe, lead the
pipe to needed position(see Fig.4).
7. Fill any distance between the wall hole and
the machine body with flexible sponge rubber
strip to prevent the entering of outer noise and
the leaking of the coolness.
8. After installation of the conditioner, insert the
power plug into the outlet and perform test-run.
(only for reference)
Rubber lid
12
350
Width of the wall
Fig. 1
Drain pan
Screw
Fig. 2
Outlet pipe fitting
Water outlet flexible
pipe(provide by user)
Fig.3
Water outlet flexible
pipe(provide by user)
Fig.4
Iron frame
Condenser
Condenser
Wall

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hw-09lf03Hw-07ck03Hw-09ck03

Table of Contents