Page 1
Instruction manual niche OD-5510L Material: Stainless steel The following installation details are If you are using a newly constructed If the distance between the wall studs applicable for existing wall before tiling wall, start the installation from step 3. are greater than the niche, add a frame and do not cover every possible around the niche to accommodate it.
Page 2
Installation of the niche 1. Locate and mark the center lines of the adjacent wall studs using a stud finder. Draw a level line between the two wall studs at the desired height to insert the niche. 2. Trace the cutting line with a pencil, above the center line, cut a cavity in the wall panel along the drawn line.
Page 3
Installation of the niche 5. Apply your installation material and fix your tiles, marbles or stones directly on the shower wall. It is preferable that the tiles are symmetrical around the support structure. 6. Apply a necessary layer of silicone around the back periphery of the flange of the niche to ensure watertightness.
Page 4
Please be sure to read the manual carefully before installation. LIMITED GUARANTEE MAINTENANCE Odass offers a guarantee 5-year Wipe the surface with a soft limited* term on all finishes of cloth after each use. Use mild niches and washbasins from the cleaning products.
Need help?
Do you have a question about the OD-5510L and is the answer not in the manual?
Questions and answers