Page 1
Instruction manual niche OD-3040 Material: 304 stainless steel, 18 gauge The following installation details are If you are using a newly constructed If the distance between the wall studs applicable for existing wall before tiling wall, start the installation from step 3.
Page 2
Installation of the niche 2. Trace the cutting line with a pencil, above the center line, cut a cavity in the wall panel along the drawn line. Make sure that the top and bottom lines are level. 3. Level and secure the upper and lower support frame to the adjacent vertical studs.
Page 3
Installation of the niche 5. Apply your installation material and fix your tiles, marbles or stones directly on the shower wall. It is preferable that the tiles are symmetrical around the support structure. 6. Apply a necessary layer of silicone around the back periphery of the flange of the niche to ensure watertightness.
Page 4
Please be sure to read the manual carefully before installation. MAINTENANCE LIMITED GUARANTEE Wipe the surface with a soft Odass warrants the finish of the cloth after each use. Use mild stainless steel niches against all cleaning products. For tougher defects in materials or...
Need help?
Do you have a question about the OD-3040 and is the answer not in the manual?
Questions and answers