Advertisement

Towel warmer
instruction
manual
Model OD-0604

SPECIFICATION

Voltage: AC 120V Frequency: 60Hz
Rated power: 65 W (OD-0604-SS/BR) | 80 W (OD-0604-MB/MW)
This towel warmer is intended for bathroom. Read the instructions
carefully before using.
1
4
2
*The part is not in the installation boxes. It is already in place on the towel warmer.
Please use the services of a certified
electrician for the hardwire
installation of this product.
Plug the power cord into an electrical
outlet for product testing before
using.
For the apparent wire installation of
this product, please verify that the
jonction box gives 120 V.
3+1
4
3+1
*
*
The drying temperature can be set
between 30° and 60 degrees Celsius
(86 to 140 °F).
The timer can be set between 1 hours
to 8 hours. Touch the screen to
select the duration of the drying.

Hardwire installation

4
4
1
The towel warmer must not work
without being tented. Please turn it
off and take the plug
out from the outlet if it is not being
use.
2
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OD-0604 and is the answer not in the manual?

Questions and answers

Summary of Contents for odass OD-0604

  • Page 1 Model OD-0604 SPECIFICATION Voltage: AC 120V Frequency: 60Hz Rated power: 65 W (OD-0604-SS/BR) | 80 W (OD-0604-MB/MW) This towel warmer is intended for bathroom. Read the instructions carefully before using. Hardwire installation *The part is not in the installation boxes. It is already in place on the towel warmer.
  • Page 2 Plug-in installation instructions 1. Rivet the base onto the nut 2. Identify the location of the with fixing screw. holes needed to screw the product on the wall. 3. Drill holes in the wall. 4. Insert screw anchor into the holes. 5.
  • Page 3 Hardwire installation instructions 2. Identify the location of the holes 1. Rivet the base onto the nut needed to screw the product on with fixing screw. the wall . 3. Drill holes in the wall. 4. Insert screw anchor into the holes. 5.
  • Page 4 10. Press the button to turn the 8. Connect the supply cable to the 9. Rivet the puller bolt device ON or OFF. Select the drying junction box and fix the plate with the fixed stopper through time from 1 hour to 8 hours. onto the junction box.
  • Page 5 Odass warrants for a period of 5 years, sa- transferred to a third party and additional installation fees. Odass cannot be held responsible nitary porcelain products (toilet, lavatorie basins) limitations apply for commercial use.

Table of Contents