Using Screens From Other Projects - Omron NS-CXDC1-V3 - 12-2009 User Manual

Hide thumbs Also See for NS-CXDC1-V3 - 12-2009:
Table of Contents

Advertisement

Using Screens from Other Projects

4-2

Using Screens from Other Projects

1,2,3...
46
2. Set or change the addresses for the symbols input from the symbol table
in step 1.
3. After the addresses have been set, they will be reflected in all the function-
al objects that reference the symbols.
HOST1: 0.00
HOST1: 0.01
Screen 1
Screens from different projects can be copied between project workspaces if
more than one copy of CX-Designer is running at the same time.
If there is an alarm/event display object, data log graph, or other functional
object on the copied screen that accesses common settings, the common set-
tings are automatically copied as well. This means that settings do not need to
be adjusted to use the same common settings in both the source and destina-
tion project.
Procedure
1. Start two copies of CX-Designer and open the source project on one copy
and the destination project on the other copy. Open the project workspace
Screen/Sheet Tab Page.
2. Select the screen to be copied on the source CX-Designer and drag-and-
drop the screen to the destination category. The dialog box for setting the
destination screen number and host will be opened.
Select the screen and
drag-and-drop to the
destination.
HOST1: 0.00
HOST1: 0.02
HOST1: 0.01
Screen 3
Screen 2
Section 4-2
Afterwards set
the addresses in
the symbol table.
HOST1: 0.02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ns-seriesCx-designer 3

Table of Contents