MOSMAN [8x8] USER MANUAL IMPORTANT Read carefully. Retain for future refence MOSMAN [8x8] - 1 03-2024...
Page 2
SAFETY & CARE GUIDELINES Take care when moving and working with the painted panels, use the supplied packaging to avoid damage to painted surfaces. When arranging the shed components for ini al check, do not store the panels laid down, stand up where possible. Ensure you fully understand the use of power tools recommended for use in assembling this shed.
Page 3
Preparing your site The installa on loca on needs to be flat, level and solid. Pavers or a solid material that will not be affected by weather can be used to perfectly level the shed by placing under the floor frame where required, make sure all members are supported.
Page 4
SHED COMPONENTS Carefully unpack all the items from shipping carton. Layout in a clean and safe area. Please check you have all compo- nents and they have no defects before proceeding. Door Assembly Door Assy, Door pre assembled WALL — BOTTOM PLATE [36] FS295T2, FS1130T2,...
Page 5
WALL - PANELS P1130, Weathertex Panel 1130 x 1824 x 9.5mm, Grooved P295, Weathertex Panel 295 x 1824 x 9.5mm, Grooved WP1130 [Op onal replaces P1130x1824] ROOF—Gable Frame [44] DG421A SG1299A PS32CSK, Pine 70 x 45 x 421mm, Apex , Pine, 70 x 45 x 1299mm, Single Groove Angled cut (x4) Phillips Screw #6 x 32mm, Countersunk.
Page 6
ROOF FRAME L709, Lock Plate 70x45x709mm RF1135, Roof Frame, Pine 70 x 45 x 1135mm. REP1153, Roof End Plate [Drilled], Pine 70 x 45 x 1153mm. [16] [76] RS1400 MO/SM, 6 Rib Roof Sheet RC1520 MO/SM, Ridge Cap (A) 1520mm . BS75, Ba en Screw 1400mm.
Page 7
WALL CONSTRUCTION—Frame Pre-drilling MATERIAL SELECTION - Pre-select top plate and upright components for assembly, mber is a natural material, selec ng best the best side of components will help the aesthe cs of the finished shed. PRE-DRILL - 3mm CP1926 [4] DG1926 [2] SG1926A [2] Drill internal webs only...
Page 8
Wall Panels Top / Bo om Plates [12] FS1130 FB20 MO/SM SG1130T2 [24] P1130x1824 DG1130T2 PS32CSK FB20, [2] PS32CSK, 8 x 18mm 4 x Single Groove Top plate [Back Wall] 2 x Double Groove Top plate [Side Walls] MOSMAN [8x8] - 8 03-2024...
Page 9
OPTIONAL: OPENING WINDOW PANEL NOTE: Window posi on in shed, will determine Top Plate configura on. If to be on the Back wall [Opposite doors]. DG1130T2 should be fi ed. If to be placed in side walls SG1130T2 is required Back MOSMAN [8x8] - 9 03-2024...
Page 10
Front Panel Top / bo om Plates DG295T2 FS295T2 FB20 MO/SM P295x1824 PS32CSK PS32CSK [6] Note: Front Panel Groove is offset. Check Orienta on before fixing Top Plates. FB20 MO/SM [6] MOSMAN [8x8] - 10 03-2024...
Page 11
Fit Corner Post [1] Panel Assy Or WP Assy CP1924 PS32CSK 2mm Gap 18mm Note: Layout Lines Construct a panel with Corner post on Right Rear face [as per image >] With SG top Rail [for Side wall] MOSMAN [8x8] - 11 03-2024...
Page 12
First Corner [1] Panel Assy + DG Top +CP PS32CSK Panel Assy + SG Top SG Top Plate DG Top Plate MOSMAN [8x8] - 12 03-2024...
Page 13
Back Wall DG1130 DG1217A1 PS32CSK Panel Assy [DG Top] CP1924 Angle cut to TOP FB32CSK [4] MOSMAN [8x8] - 13 03-2024...
Page 26
ROOF— Half Roof assembly [2] REP1153 RF1135 LP709 [12] CH1520 MO / SM RS1400 MO / SM [84] [48] [16] RS50 MO / SM BS75 RD-AS2 MO / SM 1135 1225 BS75 [10] MOSMAN [8x8] - 26 03-2024...
Page 28
OPTION—INSULATION If Insula on was specified, it needs to be fi ed to the roof frame before a aching the roofing sheets. Fix Insula on to Frame with Staples or insula on fixings where indicated (Staples / fixings not supplied). Ensure fixings are aligned with Frame.
Page 29
ROOF— Shee ng Top of Roof sheet has material folded upwards. MOSMAN [8x8] - 29 03-2024...
Page 33
RS50 MO/SM [6] Lower Roof Screws placed in Peaks of End Fixings placed in Valley nearest to end of Sheet. Do not Over ghten. Frame. MOSMAN [8x8] - 33 03-2024...
Page 34
3 Peaks 3 Peaks 3 Peaks 3 Peaks 3 Peaks RD-AS2 MO / SM [8] MOSMAN [8x8] - 34 03-2024...
Page 36
Align edge of roof frame on apex of Gable Align Base of Roof frame with Bo om of Gable Frame BS75 [3] x 2 Fix 1st Roof panel to Gables and bo om Wall before fi ng remaining roof panel. BS75 [8] BS75 [2] MOSMAN [8x8] - 36 03-2024...
Page 37
Once the first roof panel is secured into the gables slide the other roof panel up into the corresponding gable gap. Bu Roof Frames to Apex of Support block. MOSMAN [8x8] - 37 03-2024...
Page 38
Secure 2nd frame to gables. Using BS75 [3] x 2 Fasten top of Roof Frames with BS125 [4]. MOSMAN [8x8] - 38 03-2024...
Page 39
ROOF— Fix Shee ng To Facia Block RS50 MO/SM [3] x [4] MOSMAN [8x8] - 39 03-2024...
Page 41
Ridge Cap RC1520 MO/SM RS50 MO/SM RS50 MO/SM [6] Remove Protec ve film from painted face of Ridge Caps. Place ridge caps into posi on carefully, avoid dragging or scratching. Make sure peak of ridge cap is in line with peak of fascia's. Screw through ridge cap into 2nd and 8th Ribs, from each end of the roof.
Once paint is dry, seal bo om and sides of panels with supplied Silicone sealant. TO REGISTER YOUR WARRANTY Thank-you for purchasing a STILLA product. To register your 10 year product warranty, please go to www.s lla.com.au/warranty and complete the online form.
Need help?
Do you have a question about the MOSMAN 8x8 and is the answer not in the manual?