Page 1
ASCOT [12x8] USER MANUAL IMPORTANT Read carefully. Retain for future refence ASCOT [8x12] 02-2023...
Page 2
& roofing. Please fully unpack all the parts & check against the parts checklist. If you have any missing or damaged items contact customer service. Protect Painted surfaces with packaging Foam when laid down for processing. ASCOT [8x12] 02-2023...
Page 3
Light coloured crayon/chinagraph pencil white/yellow. Phillips Bit (PH2), Ba en Screw Bit, Phillips Bit #2, 5/16” Hex driver, Drill Bits 2mm, 3mm & 4mm, Countersink Bit (or Com- bina on.) This product requires a minimum of 2 persons to assemble. ASCOT [8x12] 02-2023...
Page 4
DG1130 Pine,70mm x 45mm x 1130mm, Double Groove, Plain End DG1217A1 Pine, 70mm x 45mm x 1217mm, Double Groove, Apex Angle top. SG1926A1 Pine 70 x 45 x 1926mm, Single Groove. Miter Top [216] DG1926 Pine 70x45x1926mm, Double Groove Plain ends ASCOT [8x12] 02-2023...
Page 5
, Pine, 70 x 45 x 1299mm, Single Groove Angled cut (x4) sunk. Panel Fixing to Door Frame GPL, Gable Panel Le , 1095 x 454 x 9.5mm, 22.5 Degree Pitch GPR, Gable Panel Right, 1095 x 454 x 9.5mm, 22.5 Degree Pitch ASCOT [8x12] 02-2023...
Page 6
FB173, Painted Block 70 x 45 PS32, BS100, Bugle Ba en Screw Phillips Csk Screw #6 Degree. x 173mm, Facia Spacing Block x 32mm Treated Pine, Fix 100mm Galvanized, Fix F1500 to FB145 . FB140 to Gable. ASCOT [8x12] 02-2023...
Page 7
[**Not issued if Heavy Floor is op oned] [10] [10] [20] BKT6040G, Bracket 60mm x 40mm wide, CS650, Concrete screw 6mm x 50mm. RS25, Roofing Screw 25mm Electro-Galvanised. MISCELLANEOUS TU MO/SM, Paint Touchup Sil-MO/SM, Silicone sealant 300ml – coloured Monument / Surfmist 500ml ASCOT [8x12] 02-2023...
Page 9
If op onal window is used, Window posi on in shed, will determine top plate configura on. If to be on the back wall [Opposite doors]. SG1130T2 should be fi ed. Op onal If to be placed in side walls DG1130T2 is required ASCOT [8x12] 02-2023...
Page 10
[Back Wall] 4 x Double Groove Top plate [Side Walls] Overall height of panels should be equal to ver cal beams [1926mm]. CP1926 or DG1926 can be used as a gauge to ensure ideal panel height of ASCOT [8x12] 02-2023...
Page 11
FB20 MO/SM WP877 PS32CSK PS32CSK FB20 MO/SM Overall height of panels should be equal to ver cal beams [1926mm]. CP1926 or DG1926 can be used as a gauge to ensure ideal panel height of the top plate component. ASCOT [8x12] 02-2023...
Page 12
Panel Assy Or WP Assy CP1924 PS32CSK 2mm Gap 18mm Note: Layout Lines Construct a panel with Corner post on Right Rear face [as per image >] With SG top Rail [for Side wall] ASCOT [8x12] 02-2023...
Page 13
Panel Assy + DG Top PS32CSK Panel Assy + SG Top SG Top Plate DG Top Plate ASCOT [8x12] 02-2023...
Page 14
DG1130 DG1217A1 PS32CSK Angle cut to TOP FB32CSK [4] ASCOT [8x12] 02-2023...
Page 25
Check Gable posi on is correct before Fixing in place with screws. PS32CSK Repeat sec on 16 for Other Gable ASCOT [8x12] 02-2023...
Page 26
ROOF— Half Roof assembly [2] RF1735 RF1125 LP1096 [12] CH1520 MO / SM RS1400 MO / SM [116] [48] [22] RS50 MO / SM BS75 RD-AS2 MO / SM RF1735 RF1125 BS75 [8] Pre-drilling will prevent spli ng! ASCOT [8x12] 02-2023...
Page 28
Top of Roof sheet has material folded upwards. Underside of Roof frame—Distance from sheet to frame edge. Roof sheet Top flush with top of frame. ASCOT [8x12] 02-2023...
Page 29
Lay Shee ng on Frame Sheets 1/2 overlap 1. Sheets 2/3 overlap 2 Overlap 2 ASCOT [8x12] 02-2023...
Page 33
End Frame Fixings RS50 MO/SM [3] x2 Lower Roof Screws placed in Peaks of Sheet. Do not Over ghten. End Fixings placed in Valley nearest to end of Frame. ASCOT [8x12] 02-2023...
Page 34
RD-AS2 MO / SM [11] 1st & 2nd Peaks then 3 Peak Spaces then Penul mate and Last Peak. ASCOT [8x12] 02-2023...
Page 35
Roof Assembly—Installa on [24] BS75 [12] Half roof Assembly CT-A PS50SK BS75 [3] x4 Sides Align Base of Roof frame with Bo om of Ga- ble Frame ASCOT [8x12] 02-2023...
Page 38
Make sure peak of ridge cap is in line with peak of fascia's. Screw through ridge cap into 3rd and 10th Ribs, from each end of the roof. Drive these screws through and into roof frame. RS50 MO/SM [8] 10th ASCOT [8x12] 02-2023...
Once paint is dry, seal bo om and sides of panels with supplied Silicone sealant. TO REGISTER YOUR WARRANTY Thank-you for purchasing a STILLA product. To register your 10 year product warranty, please go to www.s lla.com.au/warranty and complete the online form.
Page 53
SAFETY & CARE GUIDELINES Take care when li ing and moving components. Flooring sheets and assembled frames require a minimum of 2 per- sons to li safely. Team li ing of heavy items is recommended to avoid injury. Ensure you fully understand the use of power tools recommended for use in assembling this floor. Eye protec on should be worn when necessary, when opera ng power tools.
Page 54
Floor Frame Dimensions 8x12 has door opening on the short side; 12x8 has door opening on long side 8x12 - 12x8 Floor...
Kit Contents [12] L750 SJ1707 Log 100x100x750mm,H4 Suitable for uneven ground. It is recommended that the posts Single Joist 140x38x1707mm are concreted 400-500mm in the ground. DJ1707 EP1200 Double Joist 140x38x1707mm End Plate [Drilled] 140x38x1200mm YT505267 YT1798267 Floorboard 1798 x 267mm Floorboard 505 x 267mm.
Page 56
Assemble Quarter Frames [4] Qty listed per Frame [Qty] DJ1707 EP1200 [18] BS100 SJ1707 Assemble Frames: Assemble individual frames first. Screw through predrilled holes in End Plate (EP) into Single and Dou- ble Joists DJ & SJ) using 100mm ba en screws (100BS). Assemble the 4 frames. The frames are used to mark out the post loca ons for the floor.
Page 59
Quarter Frame Spacings Floor Nogs [F350] are ideal for use as Joist spacer. Quarter Frame [4] 8x12 - 12x8 Floor...
Page 60
Posi on and 1st Quarter frame Qty listed per Frame [Qty] L750 [16] BS100 Qtr. Frame Lay Frame in installa on loca on. Mark inside of frame posi ons, on ground. [Red do ed circle on diagram below]. Remove material to achieve level frame It is recommended that the posts are concreted 400-500mm in the ground.
Page 61
Secure Posts to Frame: Predrill [post] screw posi on prior to fi ng screws, four per post. Stagger the alignment of the Screw to avoid interference of the screws Posts and fixings arrangement. NOTE: L750 sits under DJ extension 8x12 - 12x8 Floor...
Page 62
Levelling and filling in: Once posts are fi ed and secured, move frame to prepared loca on, level the posts and frames. A level frame is essen al Concrete / Backfill each post into loca on, Check and adjust level and square before concrete sets up / Tamping in.
Page 63
Posi on 2nd Quarter frame Qtr. Frame L750 BS65 BS100 Note: DJ’s to outside edge of frame assembly. Lay Frame in installa on loca on. Mark inside of frame posi ons, on ground. [Red do ed circle on diagram above]. Remove sufficient material to achieve level frame 8x12 - 12x8 Floor...
Page 65
Repeat fixing and levelling process as in step 2. Fasten Frames with BS65 prior to fixing Logs. Levelling and filling in: Once posts are fi ed and secured, level the posts and frames. A level frame is essen al Concrete / Backfill each post into loca on, Check and adjust level and square before concrete sets up / Tamping in.
Page 67
Floor Nogs [36] FN350 BS100 [4] BS100 per Nog. Fixing the top of Nog flush with top of the frame will assist with floor level. Final check for frame/s level should be made before Flooring is fi ed. Please ensure posts and frames are level before finalizing Concre ng or Tamping in of posts.
Page 69
Note: There are crosses printed on the Floorboard surface. These are used for manu- facturing control and not alignment points for fixings. PS50CSK—[3] per Joist PS50CSK—[2] covering Nogs 8x12 - 12x8 Floor...
Page 75
TO REGISTER YOUR WARRANTY Thank-you for purchasing a STILLA product. To register your 10 year product warranty, please go to www.s lla.com.au/warranty and com- plete the online form. We recommend that you complete this step once you have finished installing your product.