Analog I/O Slave Unit (input) Functions
11-4-11 Last Maintenance Date
Description
Setting Using the CX-Integrator
1,2,3...
1,2,3...
Writes the maintenance date to the unit, individually to units and connected
devices. It enables the user to easily determine the next maintenance date.
The date can be set using the CX-Integrator.
■ Setting the Last Maintenance Date of the Unit
1. Turn ON the power supply to the CompoNet Slave Unit.
2. Double-click the icon of the Slave Unit to set in the Network Configuration
Window to open the Configuration Window. (Alternatively, right-click the
icon and select Parameters - Edit from the pop-up menu.)
3. Click the General Tab and select a date from the Last Maintenance Date
Field. (To enter the current date, select Today from the bottom of the pull-
down menu.)
4. Click the Transfer [PC to Unit] Button to download the data, and then click
the Reset Button to reset the Unit.
5. Click the OK Button and exit the window.
■ Setting the Last Maintenance Date of the Connected Device
1. Turn ON the power supply to the CompoNet Slave Unit.
2. Double-click the icon of the Slave Unit to set in the Network Configuration
Window to open the Configuration Window. (Alternatively, right-click the
icon and select Parameters - Edit from the pop-up menu.)
3. Click the Tab Page for the input that is connected to a device requiring the
last maintenance date to be set. Select the applicable date from the pull-
down menu in the Last Maintenance Date Field. (To enter the current date,
select Today, which is at the bottom of the pull-down menu.)