FOR THE FOLLOWING ITEMS, TAKE SPECIAL CARE DURING CONSTRUCTION AND
CHECK AFTER INSTALLATION IS FINISHED.
a. Items to be checked after completion of work
Items to be checked
Are the indoor and outdoor unit fixed firmly?
Is the installation unit and the outdoor unit
completed?
Is the gas leak test finished?
Is the unit fully insulated?
Does drainage flow smoothly?
Does the power supply voltage correspond
to that shown on the name plate?
Are wiring and piping correct?
b. Items to be checked at time of delivery
Also review the "SAFETY PRECAUTIONS"
c. Points for explanation about operations
2-3 NOTE TO THE INSTALLER
Be sure to instruct customers how to properly operate the unit (especially cleaning filters, operating different
functions, and adjusting the temperature) by having them carry out operations themselves while looking at the
manual.
4
If not properly done, what is likely to occur
The units may drop, vibrate or make noise.
The unit may malfunction or the compo-
nents burn out.
It may result in insufficient cooling.
Condensate water may drip.
Condensate water may drip.
The unit may malfunction or the compo-
nents burn out.
The unit may malfunction or the compo-
nents burn out.
Check
English

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FHQG71CVEB and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Fhqg100cvebFhqg125cvebFhqg140cveb

Table of Contents