Retest After Repair - Lincoln Electric LN-25 Service Manual

Hide thumbs Also See for LN-25:
Table of Contents

Advertisement

F-41
1. Connect a supply of filtered compressed air at 80 psi to the
gas inlet.
2. Supply 15 to 110 VAC to the machine.
3. Connect the gun to the connector block.
WIRE FEED SPEED....................50 THROUGH 700 INCHES
PER MINUTE
VOLTMETER......................MUST BE OPERATED BETWEEN
3 TO 12 VDC
GAS SOLENOID...MUST OPERATE WHEN GUN TRIGGER IS
ACTIVATED
CONTACTOR........MUST OPERATE WHEN GUN TRIGGER IS
ACTIVATED
TROUBLESHOOTING AND REPAIR

RETEST AFTER REPAIR

Retest a machine :
• If it is rejected under test for any reason that requires
you to remove any part which could affect the
machine's electrical characteristics.
• If you repair or replace any electrical components.
SET UP
OPERATION VERIFICATION
LN-25™ PIPE
OR
F-41

Advertisement

Table of Contents
loading

This manual is also suitable for:

11779

Table of Contents