Download Print this page

Advertisement

Quick Links

Chassis Quick
Installation Guide
®
For the CoreBuilder
9000 Enterprise Switch 8-slot Chassis and
16-slot Chassis
®
Read this document before you attempt to install the CoreBuilder
9000
Enterprise Switch 8-slot chassis (Model Number 3CB9E8) or the 16-slot
chassis (Model Number 3CB9E16).
This guide is intended for the system or network administrator who is
responsible for installing and managing the network hardware.
WARNING: The CoreBuilder 9000 chassis must be installed, removed, or
replaced only by trained service personnel. Do not attempt to install,
remove, or replace a CoreBuilder 9000 chassis if you have not had the
proper training from 3Com. For information about 3Com's training
offerings, call 1-800-NET-3COM, then press option 3. Outside the United
States, contact your local 3Com office.
This document explains how to unpack and install a CoreBuilder 9000
8-slot chassis (Figure 1) and 16-slot chassis (Figure 2).
WARNING: You can install the CoreBuilder 9000 chassis on a table or a
shelf, or into a rack. To minimize the risk of personal injury or equipment
damage, 3Com recommends that at least two people perform a chassis
installation.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 3CB9E8 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for 3Com 3CB9E8

  • Page 1 ® Read this document before you attempt to install the CoreBuilder 9000 Enterprise Switch 8-slot chassis (Model Number 3CB9E8) or the 16-slot chassis (Model Number 3CB9E16). This guide is intended for the system or network administrator who is responsible for installing and managing the network hardware.
  • Page 2 Chassis Quick Installation Guide Figure 1 CoreBuilder 9000 Enterprise Switch 8-slot Chassis Switch fabric module slots Interface Management module slots module slots ® CoreBuilder 9000 Power supply slots...
  • Page 3 Chassis Quick Installation Guide Figure 2 CoreBuilder 9000 Enterprise Switch 16-slot Chassis Interface Switch fabric Interface module module module slots slots slots ® CoreBuilder 9000 Power supply slots Management module slots Unless otherwise noted, the same installation procedures apply to both the CoreBuilder 9000 8-slot chassis and the 16-slot chassis.
  • Page 4 Chassis Quick Installation Guide Figure 3 illustrates the tasks to perform to set up a CoreBuilder 9000 Switch Setup Tasks 8-slot or 16-slot Enterprise Switch. Figure 3 Setup Tasks for CoreBuilder 9000 Enterprise Switch 8-slot Chassis and 16-slot Chassis Determine Site Requirements •...
  • Page 5 Chassis Quick Installation Guide Follow these steps: Unpacking Instructions 1 Place the chassis shipping box near the rack, the table, or the shelf where you plan to install the chassis. WARNING: Safety regulations state that the selected table, shelf, or rack must be able to support at least three times the weight of a fully loaded chassis.
  • Page 6 Chassis Quick Installation Guide CoreBuilder 9000 Web Management User Guide Power Supply Installation Guide for the CoreBuilder 9000 Enterprise Switch 8-slot Chassis and 16-slot Chassis CoreBuilder 9000 Documentation Overview One chassis rack-mount template The contents at the top of the shipping box are the same for the 16-slot chassis and the 8-slot chassis.
  • Page 7 Chassis Quick Installation Guide Figure 4 Contents of the CoreBuilder 9000 Chassis Shipping Box Chassis Top Chassis rack-mount template Plastic label bezel ® CoreBuilder 9000 Pre-installed Plastic power supply air grille bezel (16-slot chassis only) Documentation CD-ROM 2 Mounting shelves Plastic feet 6-32 screws 10-32 screws...
  • Page 8 Chassis Quick Installation Guide 4 Remove the top foam packing material (Figure 5). Figure 5 Removing the Chassis Shipping Box Top foam packing material Corrugated sleeve Bottom foam Remove locking inserts packing material by pinching top of inner latch mechanism together to release and pull out Shipping skid 5 On the outside of the shipping box on the skid, remove the locking...
  • Page 9 Chassis Quick Installation Guide The 8-slot chassis is shipped with module slot 1, slot 7, and slot 9 empty; power supply slot 1 empty; and management module slot 9 empty. No blank faceplate covers these slots. See Figure 6. Figure 6 The CoreBuilder 9000 8-slot Chassis is Shipped with These Slots Empty Switch fabric module slot 7 Interface...
  • Page 10 Chassis Quick Installation Guide The 16-slot chassis is shipped with module slot 1, slot 8, and slot 17 empty; power supply slot 1 empty; and management module slot 17 empty. No blank faceplate covers these slots. After you receive the chassis, remove the faceplate from power supply slot 4 to help make chassis installation easier.
  • Page 11 Chassis Quick Installation Guide 7 While the 8-slot chassis or the 16-slot chassis is still in the base of the shipping box, have one person grasp the chassis and tilt the chassis backward. 8 To make chassis installation easier, remove another blank faceplate from a power supply slot.
  • Page 12 Chassis Quick Installation Guide This section provides safety precautions, installation guidelines, and Preinstallation location requirements to help you install the CoreBuilder 9000 8-slot Guidelines chassis and 16-slot chassis into your environment. Safety Precautions Read this section before you install the CoreBuilder 9000 8-slot chassis or 16-slot chassis.
  • Page 13 Chassis Quick Installation Guide WARNING: Safety regulations state that the selected table, shelf, or rack must be able to support at least three times the weight of a fully loaded chassis. A fully loaded 8-slot chassis weighs approximately 71.7 kg (158 lb). Therefore, the selected table, shelf, or rack must support at least 215.1 kg (474 lb).
  • Page 14 Chassis Quick Installation Guide Figure 8 Rack Types Bolt the rack to the floor. Brace the top of the rack against the wall. Make certain that the rack is properly aligned and squared. Use a framing tool to ensure that the rack is squared. To help support the chassis while you install it in a rack, install the mounting shelves that are shipped with your chassis.
  • Page 15 Chassis Quick Installation Guide If you want to use an optional cable management device, install it above or below the chassis (depending on which type of device you choose). You can install the chassis in the rack either before or after you install a cable management device.
  • Page 16 Chassis Quick Installation Guide Figure 9 Preinstalled Rack-mount Flange Location and Slot Types on the CoreBuilder 9000 8-slot Chassis ® CoreBuilder 9000 Preinstalled flange pin Telco rack open slot Metric rack closed slot Figure 10 Preinstalled Rack-mount Flange Location and Slot Types on the CoreBuilder 9000 16-slot Chassis ®...
  • Page 17 Chassis Quick Installation Guide Using the Chassis Rack-mount Template Use the paper rack-mount chassis template (which is an accurate copy of the chassis rack-mount flange) to help you position the mounting shelves and the CoreBuilder 9000 chassis when you install them into a rack. See Figure 2.
  • Page 18 Chassis Quick Installation Guide Figure 11 Slots on the Rack and Distances Between Each Slot Alignment pin position 1/2" 5/8" 5/8" Paired slot 1/2" 5/8" 5/8" 1/2" 5/8" Single slot 5/8" 1/2" 3 Insert a mounting shelf in the rack. a Select the desired rack slot position, using the top slot of a pair of slots for the mounting shelf alignment pin (Figure 12).
  • Page 19 Chassis Quick Installation Guide 4 Using a Phillips screwdriver or flat-blade screwdriver, insert the two screws and tighten (Figure 12). Figure 12 Installing a Mounting Shelf into the Rack Rack Preinstalled alignment pin Preinstalled alignment pin Screws Mounting shelf 5 Repeat steps 3 and 4 to mount the other shelf on the opposite rack rail. Make certain that the mounting shelf is aligned to the same rack slot positions on both sides of the rack.
  • Page 20 Chassis Quick Installation Guide This section describes how to install the chassis: Installing the Chassis In a rack without clip nuts In a rack with clip nuts On a table or a shelf You may have other types of racks at your site. Follow the manufacturer’s suggested installation procedures.
  • Page 21 Chassis Quick Installation Guide For the 16-slot chassis: a Standing on one side of the chassis, one person places a left hand in power supply slot 4 and with the right hand grasps the handle at the top rear of the chassis. b The other person, who is standing on the opposite side of the chassis, places a right hand in power supply slot 1 and with the left hand grasps the handle on the top rear of the chassis.
  • Page 22 Chassis Quick Installation Guide Installing the Chassis in a Rack Using Rack-Mount Clip Nuts Follow these steps to mount the chassis in a rack when you use rack-mount clip nuts. Not all racks require that you use rack-mount clips. Use whatever method of rack-mount equipment that you have to meet installation requirements in a rack.
  • Page 23 Chassis Quick Installation Guide Figure 13 Installing a Rack-mount Clip in the Rack Rack rail 10-32 inch screw Be sure to thread the screw through this nut to securely Top view attach each clip to the rack 6 Slide the chassis into the rack, using the mounting shelves for support, until both chassis rack-mount flanges are up against the rack.
  • Page 24 Chassis Quick Installation Guide 9 Attach the plastic label bezel to the chassis. a With both hands, grasp the plastic label bezel and face the front of the chassis. b Snap the plastic label bezel onto the top front of the chassis to secure Installing the Chassis on a Table or Shelf This section describes how to attach plastic feet to the chassis and how to install the chassis on a table or a shelf.
  • Page 25 Chassis Quick Installation Guide 3 Position the chassis on its side so that you can access the bottom of the chassis. 4 Remove the four feet and the four screws from the hardware kit. 5 Using a flat-blade screwdriver, screw the feet to the bottom of the chassis.
  • Page 26 Chassis Quick Installation Guide 3Com offers two ring cable management devices. You may have other Optional Cable types of cable management devices at your site. Follow the Management Device manufacturer’s suggested installation procedures. The Ring Cable Management Devices (Model Numbers 3C95CM1 and 3C95CM2) manage module cables from the top or bottom of the 8-slot chassis and the 16-slot chassis.
  • Page 27 Chassis Quick Installation Guide The ring cable management device accessory kit includes: Four #10-24 5/8-inch screws and rack-mount clips Four #10 nylon flat washers Cable Management Device Preinstallation Guidelines Before you install any cable management device in a rack, determine which cable management device rack-mount position is best by examining the: Location in the rack where you plan to install the chassis...
  • Page 28 Chassis Quick Installation Guide 3 Using a Phillips screwdriver or flat-blade screwdriver, secure the ring cable management device to the rack with the screws that are provided (four 10-24 x 5/8 inch screws) and with the rack-mount clips. a If you use the rack-mount clips, attach the nylon flat washers to the back of the screws (to protect the face of the ring cable management device), and place the rack-mount clips on the rack rail.
  • Page 29 If you have difficulty installing the Acrobat Reader, use an Internet browser to download the reader from the Adobe home page at: http://www.adobe.com You can view additional 3Com technical documentation on the 3Com home page at: http://www.3com.com Click Support and look under Support Tools, Documents and Information.
  • Page 33 3Com warrants to the end user (“Customer”) that this hardware product will be free from defects in workmanship and materials, under normal use and service, for one (1) year from the date of purchase from 3Com or its authorized reseller.
  • Page 34 Advance Replacement is provided for ninety (90) days, after which time it may be available for a specified fee. 3Com will make commercially reasonable efforts to ship the replacement product not later than five (5) business days after receiving the request for advance replacement, but may be delayed due to product avail- ability or export or import procedures.
  • Page 35 MISSIONS OMPLIANCE TATEMENTS FOR LASS RODUCTS Federal Communications This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 Commission Notice of the FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment.
  • Page 36 3Com registered trademarks are registered in the United States and may or may not be registered in other countries. 3Com, the 3Com logo, and CoreBuilder are registered trademarks of 3Com Corporation.

This manual is also suitable for:

3cb9e16