Weil-McLain SlimFit 2 Series Manual page 8

Commercial condensing gas-fired water boilers
Hide thumbs Also See for SlimFit 2 Series:
Table of Contents

Advertisement

SlimFit
Series 2
®
Prepare boiler location
Placing multiple boilers
1. Locate multiple boilers in boiler room
to provide the clearances shown in:
a. Figure 4 (side-to-side), or
b. Figure 6 (mirror-image mounting).
c. Other layouts can be used if all re-
quired clearances are maintained.
2. Provide indicated clearances around
boilers for access and servicing. If
recommended dimensions are not
Figure 4
Side-to-side mounting of multiple SlimFit boilers — LEFT-HAND boilers only
Figure 5
Side-to-side mounting of multiple SlimFit boilers — RIGHT-HAND boilers only
8
commercial condensing gas
(continued)
possible, provide at least the minimum
clearances given on page 7. Also follow
local codes.
3. Construct boiler foundation if boiler
room floor is uneven or if there is a dan-
ger of flooding. Size foundation to allow
for clearance and spacing dimensions
shown in either Figure 4 or Figure 6.
— Boiler Manual
-
fired water boiler
Verify that boiler placement and clearances
comply with all applicable codes.
4. Chalk-line boiler locations on founda-
tion or boiler room floor.
5. Uncrate, assemble and mount boilers
according to instructions in this manual.
6. Provide clearance for installation of
venting, air piping, gas piping, con-
densate piping and components, ex-
pansion tank, boiler pump and other
accessories.
Part number 550-100-561/0224

Advertisement

Table of Contents
loading

Table of Contents