www.ti.com
EVM User's Guide: TXV0106EVM TXV0108EVM
TXV010xEVM Evaluation Module
Description
The TXV-EVM is an easy-to-use platform to
evaluate the functionality and performance of the
TXV0106BQB
and
TXV0108RGY
TXV-EVMs have optional circuits and jumpers
to configure the device for different applications.
The
TXV0106BQB
and
TXV0108RGY
options for both fixed and direction control low-skew,
low jitter voltage translation, for 6-bit and 8-bit
applications respectively. The outputs of the devices
can be enabled and disabled through a dedicated
output enable control feature.
Get Started
1. Order the EVM from ti.com
TXV0108-EVM)
a. The ordered EVM is already preset for A to B
voltage translation.
b. Use short high-speed cables for optimized
high-speed data throughput.
c. Use active probes for optimized signal
integrity.
2. Reference the user's guide for additional setup.
3. Evaluate the TXV devices per the user's system
requirements.
TXV-EVM 6 Channel
SCEU026 – FEBRUARY 2024
Submit Document Feedback
devices. The
devices offer
(TXV0106-EVM
or
Copyright © 2024 Texas Instruments Incorporated
4. Use E2E forums for any additional support.
Features
•
SMA connectors for high-speed data throughput.
•
50Ω termination resistors for impedance control.
•
OE control for disabling and enabling the outputs.
•
DIR control for configuring A-to-B or B-to-A voltage
translation (TXV0108-EVM).
•
Pull-up or pull-down resistors for avoiding floating
inputs.
•
Flexibility for capacitive loading on all data IO pins.
•
Jumper test points for probing input and output
signals.
•
Designed and optimized for skew measurements
in the pico-second range.
Applications
•
Medium or short range radar
•
ADAS domain controller
•
HVAC controller design
•
Machine vision camera
•
Rack sever motherboard
•
IP telephone
TXV-EVM 8 Channel
Description
TXV010xEVM Evaluation Module
1
Need help?
Do you have a question about the TXV010 EVM Series and is the answer not in the manual?
Questions and answers