Download Print this page

OLT GH88 Assembly Manual page 31

8'x8' greenhouse

Advertisement

36.
Lift and position Door in opening. Leave a 3/8" gap at the bottom. Use a Cedar Shingle Shim
to shim the Door at the bottom to help position Door evenly. When Door is aligned correctly, screw
Hinge into Vertical Door Frame Trim with 1 - 2" Black Headed Screws. Use only 1 screw initially per
Hinge. Confirm Door swings correctly before attaching remaining screws.
37.
Position both Door Handle & Drop Latch onto Door Frame and fasten with bundled Hardware.
Pre Drill holes with 1/8" Bit before attaching.
Outdoor Living Today
Leave a 3/8 Gap
Hardware:
- 9x 2" Black Headed Screws
Hardware:
- 1x Door Handle
- 1x Flip Latch
www.outdoorlivingtoday.com
Page 31
sales@outdoorlivingtoday.com

Advertisement

loading