Download Print this page

OLT GH88 Assembly Manual page 27

8'x8' greenhouse

Advertisement

29.
Repeat Step 28 to install remaining 3 Potting Shelves along sides of Greenhouse.
Pieces:
- 3x Potting Shelf
(16" x 44 3/4")
- 6x Potting Shelf Leg
(1 1/2" x 1 1/2' x 22 1/2")
30.
Locate Metal Ridge Caps. Place both Metal Ridge Caps on top of Greenhouse Ridge Board.
Ridge Caps will over lap in the center. Fasten Ridge Cap to Rafters with 1 - 2" Metal Roof Screw
per Rafter. Do not overtighten.
Pieces:
- 2x Metal Ridge Cap
(60" long)
Outdoor Living Today
www.outdoorlivingtoday.com
Page 27
Hardware:
- 15x 2 1/2" Brown Screws
Hardware:
- 10x 2" Metal Roof Screws
- 1x 1/4" Nut Driver
sales@outdoorlivingtoday.com

Advertisement

loading