OLT GH88 Assembly Manual page 29

8'x8' greenhouse

Advertisement

33.
Locate Door Framing pieces and Door Poly. Fasten two vertical framing pieces to one
Horizontal piece. Slide Door Poly Bottom down into the dado in the door framing. Position Center
Door Framing above the Bottom Poly piece so it fits over the poly. Screw through Vertical Framing
into Center Framing with 2 - 2 1/2" Brown Screws per end. Slide Door Top Poly into the dado on top
of Center Framing. Cap off door with remaining Horizontal Framing and screw into Vertical Framing.
Pieces:
- 2x Vertical Door Framing
(1 1/2" x 3 1/2" x 83 1/2")
- 2x Horizontal Door Framing
(1 1/2" x 3 1/2" x 30 3/4")
- 1x Center Door Framing
(1 1/2" x 3 1/2" x 27 3/4")
- 1x Door Top Poly
(28 3/4" x 49 7/8")
- 1x Door Bottom Poly
(28 3/4" x 34 1/8")
Outdoor Living Today
www.outdoorlivingtoday.com
Page 29
Hardware:
- 12x 2 1/2" Brown Screws