Download Print this page

OLT GH88 Assembly Manual page 11

8'x8' greenhouse

Advertisement

Foundation
1. Site Selection:
- Begin by choosing an appropriate location for
your greenhouse.
- Ensure the site is level and well-prepared.
2. Excavation and Base Preparation:
- Excavate an area measuring 9'x9' to a depth
of 2-3 inches.
- Level the dirt base thoroughly.
- Lay approximately 2 inches of sand on the
base, compacting it evenly.
3. Cedar Foundation Framing:
- Position the foundation framing on the level
sand base.
- Securely attach the foundation posts together.
Refer to Step 1 of manual for assembly.
- Verify that the footprint is square by
measuring diagonally from corner to corner.
4. Optional Reinforcement:
- Optionally, secure the foundation posts to the
ground using tie-down kits or by drilling and
hammering 12-inch-long rebar pieces through
the posts into the ground.
5. Landscape Cloth Installation:
- Lay landscape cloth over the entire area,
cutting off any excess fabric around the
edges.
- Ensure that the ground cover (weed barrier)
used is specifically designed for landscaping,
allowing water drainage while preventing
weed growth.
6. Gravel Placement:
- Pack approximately 4 inches of small gravel
on top of the landscape cloth to complete the
foundation and floor.
Remember to follow these steps diligently to
create a stable and cost-effective foundation
for your greenhouse. Happy building!
Outdoor Living Today
www.outdoorlivingtoday.com
Page 11
Excavation
3/4 Cubic Yard Sand
Foundation Framing
Landscape Cloth
Gravel
sales@outdoorlivingtoday.com

Advertisement

loading