Download Print this page

OLT GH88 Assembly Manual page 26

8'x8' greenhouse

Advertisement

27.
Locate Wall Trims. Position Wall Trims over top of wall panels. Fasten Wall Trims to walls from
the inside of the greenhouse by screwing up through the top framing of the wall panels with 2 - 2
1/2" Brown Screws each. You can slide the Side Wall poly up if needed.
Pieces:
- 8x Side Wall Trim
(1 1/2" x 1 1/2" x 19 1/2")
- 4x Corner Wall Trim
(1 1/2" x 1 1/2" x 28 1/2")
- 1x Rear Center Wall Trim
(1 1/2" x 1 1/2" x 31 1/2")
28.
Locate Potting Shelves & Potting Shelf Legs. Position Shelf tight to rear corner of greenhouse.
Top of shelves should be positioned along side top of walls but may be positioned lower if you wish.
Place the Shelf Legs underneath the shelf so the bottom is flush with the 2x3 shelf framing and the
4x4 posts. Fasten at the top and bottom of the Shelf Leg with 1 - 2 1/2" Brown Screw per end.
Fasten shelf to rear wall through framing with 1 - 2 1/2" Brown Screw.
Pieces:
- 1x Potting Shelf
(16" x 44 3/4")
- 2x Potting Shelf Leg
(1 1/2" x 1 1/2' x 22 1/2")
Outdoor Living Today
www.outdoorlivingtoday.com
Page 26
Top Wall Trim
Hardware:
- 26x 2 1/2" Brown Screws
Hardware:
- 5x 2 1/2" Brown Screws
sales@outdoorlivingtoday.com

Advertisement

loading