Download Print this page

Waterworld Proline QC RO Instruction Manual page 7

Advertisement

Sink
Never mount here
2) Mark the hole position on the pipe and drill a ¼'' hole
through one side of the pipe. Be careful not to drill the hole
through both sides of the pipe.
1) The head assembly will stand up in the sink cabinet or can be hung on screws.
2) The storage tank may be laid on its side. The bladder tank will function in both a horizontal or vertical position.
3) The head assembly and/or storage tank may be placed up to 10 feet from the point of use with some pressure loss.
Your QC-RO system is equipped with EZ fittings. The quick connect fittings feature leak proof installations. EZ Fittings
provide efficient quick connection and disconnection resulting in reduction of service time and labor cost.
1. Cut tubing square
2. Insert tube
3. Push up to tube stop
4. Pull to check secure
Push in collet and remove tube
Disconnecting
Drain Clamp Installation
1) The drain clamp assembly should be installed above the trap and
on the vertical or horizontal tail piece.
Mount drain
saddle
at either location
3) Affix gasket provided with the drain clamp onto inside of clamp piece matching the
holes. The center hole on the gasket must be removed.
4) Make sure to align drain saddle to drilled hole. Attach drain clamp to drain pipe and
tighten the two screws evenly.
5) Connect the 1/4" red tubing to the drain clamp (or 3/8" when air gap faucet is used).
Positioning The System
EZ Fittings-Quick Connect
Cut the tube square. It is essential that the outside diameter be free of score marks and
that burrs and sharp edges be removed before inserting into fittings. For soft thin walled
plastic tubing, we recommend the use of a tube insert.
Fitting grips before it seals. Ensure tube is pushed into the tube stop.
Push the tube into the tube stop. The collet (gripper) has stainless steel teeth which hold
the tube firmly in position while the o-ring provides a permanent leak proof seal.
Pull on the tube to check that it is secure. It is a good practice to test the system prior to
leaving site and/or before use.
To disconnect, ensure the system is depressurized before removing the tube.
Push on collet
Push in collet squarely against face of fitting. With the collet held in the position,
the tube can be removed. The fitting can there be re-used.
Pull on tubing
5

Advertisement

loading

Related Products for Waterworld Proline QC RO