Installing Your Management Module - Zhone 4000E Installation Instructions Manual

Ip broadband loop carrier
Table of Contents

Advertisement

Installing Your Management Module

Installing a Management Module
8
4000E IP Broadband Loop Carrier Installation Instructions
A management module provides the functional control for the 4000E BLC;
the 4000E cannot function without one. There are several different models
available. Contact your sales representative.
An uplink module provides the upstream network connection for the 4000E
BLC; a management module cannot function without one. Depending on the
management module model that you plan to install in your 4000E, you will
need either a Media Interface Module (MIM) or an Uplink Interface Module
(UIM). Only one uplink module is required for operational purposes.
However, two uplink modules may be installed, one in each port of the
management module, if redundancy is desired. Refer to your management
module or uplink module installation instructions for further information.
CAUTION
If a slot cover is removed from a management module uplink port, it must
be replaced with an uplink module. DO NOT OPERATE A 4000E WITH
A MANAGEMENT MODULE THAT HAS AN OPEN UPLINK PORT.
1 Identify the appropriate slot for installation.
The 4000E is a five slot chassis: slots 1–4 are reserved for interface
modules and Slot U1 is reserved for a management module. The 4000E is
shipped from the factory with slots 1 and U1 open and ready for module
installation.
2 Align the management module with the slot module guides. With the
management module printed circuit board (PCB) facing up and the
management module model name on the right side of the module
faceplate (facing towards you), align the left and right edges of the PCB
with the U1 slot module guides on the 4000E.
IPD4-A2-ZZ40-20

Advertisement

Table of Contents
loading

Table of Contents