Advertisement

Quick Links

Quick Installation Manual
APX 5.0~30.0P-S2
.
Shenzhen Growatt New Energy Co.,Ltd

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the APX 5.0P-S2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Growatt APX 5.0P-S2

  • Page 1 Quick Installation Manual APX 5.0~30.0P-S2 Shenzhen Growatt New Energy Co.,Ltd...
  • Page 2: Environment Requirements

    Environment requirements Max.+50℃ RH +5%~+95% Min.-10℃ Installation tools 1 N·m 2 N·m Dimensions Unit:mm APX 98034-P2 (Power Module) APX 5.0P-B1 (Battery Module) 1.Inspection upon delivery 1- 1 Checking the APX 98034-P2 packing list Please check that the contentsare complet INV BAT + to PCS INV BAT -...
  • Page 3: Battery Capacity

    Right trim-cover*1 Left trim-cover*1 Checking the APX 5.0P-B1 packing list to Battery Module APX 5.0P-B1(BM ) Parallel cable *1 Anti-tipping plate *2 M6 expansion screw *2 M4x9 stainless steel screw *3 Trim-cover *2 Check accessories APX 98034-P2 APX 5.0P-B1 Wall bracket 2.5 meters 2.5 meters APX 5.0P-B1 Parallel...
  • Page 4: Installation Environment Requirement

    2.Installation Environment Requirement Note: Install a sun/rain shade to avoid exposure to direct sunlight and rain. 3.Floor-mounted installation Installation Location Requirements Wall Ground Ground Note: When mounted on the ground,a maximum of six battery modules can be stacked. If you are installing more than four modules you are advised to install them in two columns. Installation Procedure Unit:mm Mounting Hole Dimensions...
  • Page 5 Marking pen Level Install the connecting pieces on both Level the battery modue using a level. sides and tighten the two screws . Install the anti-tipping plates on both sides and Mark the hole positions. tighten the two screws . Dia 8.0mm M6 expansion screw...
  • Page 6: Wall-Mounted Installation

    4. Wall-Mounted Installation Installation Location Requirements ≥ 300mm ≥ 300mm ≥ 300mm Ground Ground Note: When mounted on the wall,a maximum of five battery modules can be stacked. Please ensure that the load-bearing capacity of the wall exceeds 280 kg. Unit:mm Installation Procedure Installation Procedure...
  • Page 12 Shenzhen Growatt New Energy Co., Ltd. 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Blvd, Bao'an District, Shenzhen, China +86 755 2747 1942 service@ginverter.com www.ginverter.com GR-UM-359-A-01...

This manual is also suitable for:

Apx 30.0p-s2

Table of Contents