Download Print this page

ABB ReliaMod RMM B 4R Installation And Maintenance Instructions Manual page 13

Modular metering

Advertisement

Available languages

Available languages

Conversion from B-C to A-C
2. Remove meter-barrier at the location to convert
3. Remove phase-link and B-phase strap
4. Install phase A strap in position A
5. Do not use phase-link and insulation sheet
6. Tighten all connections to 170 in-lbf.
7. Re-install meter-barrier
Conversion from A-B to A-C
2. Remove meter-barrier at location to convert
3. Remove phase-link and B-phase strap
4. Install C-phase strap in position C
5. Do not use phase-link and insulation sheet
6. Tighten all connections to 170 in-lbf.
7. Re-install meter-barrier
Conversion from B-C to A-B
2. Remove meter-barrier at location to convert
3. Remove C-phase strap
4. Switch phase-link and insulation sheet
from position A-B to position B-C
5. Install A-phase strap in position A
6. Tighten all connections to 170 in-lbf.
7. Re-install meter-barrier
Conversion from A-B to B-C
2. Remove meter-barrier at location to convert
3. Remove A-phase strap
4. Switch phase link and insulation sheet
from position B-C to position A-B
5. Install C-phase strap in position C
6. Tighten all connections to 170 in-lbf.
7. Re-install meter-barrier
13

Advertisement

loading