Screen Innovations Zero Edge Series Installation Instructions Manual

For slate /at, maestro 2, pure /at, short throw

Advertisement

Quick Links

Zero Edge / Fixed
Installation Instructions
(Slate /AT, Maestro 2, Pure /AT, Short Throw)
INSTALLERS: PLEASE LEAVE THIS MANUAL WITH THE OWNER.
400025
|
v. 2.3 | December 2023

Advertisement

Table of Contents
loading

Summary of Contents for Screen Innovations Zero Edge Series

  • Page 1 Zero Edge / Fixed Installation Instructions (Slate /AT, Maestro 2, Pure /AT, Short Throw) INSTALLERS: PLEASE LEAVE THIS MANUAL WITH THE OWNER. 400025 v. 2.3 | December 2023...
  • Page 2 SUGGESTED PROJECTOR PLACEMENT Please visit our Screen Material Wizard (screeninnovations.com/tools/screen-material- wizard/) for the minimum throw distance requirements based on screen material. NOTE: Illustration below shows where the projector should be mounted when using Black Diamond or Slate materials. Better 11° Best 11°...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS Determine Frame Type Standard - Inner Frame Assembly 5 - 6 Split - Inner Frame Assembly 7 - 9 LED Lights Attachment 10 - 11 Determine Your Material Material Attachment Sequence – All Materials Material Rolling Slate, Short Throw, Pure Material Attachment Maestro 2 (White) –...
  • Page 4: Determine Frame Type

    DETERMINE FRAME TYPE Determine the frame type ordered. If the frame is 120” and above it will be Split frame assembly, anything below 120” will be standard frame assembly. Standard Frame Split Frame...
  • Page 5: Standard - Inner Frame Assembly

    STANDARD - FRAME ASSEMBLY Ensure the build is clean and free of debris, it is recommended that assembly be done on a clean drop cloth or similar. NOTE: The frames are labeled but the lower horizontal frame can be identified by the hole allowing for LED cables, this is particularly important if an LED kit was ordered with the screen.
  • Page 6 STANDARD - FRAME ASSEMBLY Align the frame corners to be flush and 90 degrees before loosely tightening one set screw on either side of the corner (on each corner of the frame) the frame must be square before fully tightening frame screws. Critical Step: Frame squareness is critically importance, refer to the diagram and measure the frame diagonals and compare.
  • Page 7: Split - Inner Frame Assembly

    SPLIT - FRAME ASSEMBLY Ensure the build is clean and free of debris, it is recommended that assembly be done on a clean drop cloth or similar. NOTE: The frames are labeled but the lower horizontal frame can be identified by the hole allowing for LED cables, this is particularly important if an LED kit was ordered with the screen.
  • Page 8 SPLIT - FRAME ASSEMBLY Align the frame corners to be flush and 90 degrees before loosely tightening one set screw on either side of the corner (on each corner of the frame) the frame must be square before fully tightening frame screws. Critical Step: Frame squareness is critically important, refer to the diagram and measure the frame diagonals and compare.
  • Page 9 SPLIT - FRAME ASSEMBLY Install the vertical support bar by aligning the channel plates to be roughly centered on the frame, loosely screw the support bar to the channel plates and adjust to square by measuring top and bottom to the same vertical frame before tightening fully. Note: The vertical support bar can be installed off center to accommodate a center channel speaker or electrical outlet when using the LED kit.
  • Page 10: Led Lights Attachment

    LED LIGHTS ATTACHMENT If IP (Zigbee) LED controller was selected, a Phillips Hue Hub is needed to accommodate integration and should be set up before LED’s are powered. If added later, the IP LED controller will need to be forced into pairing mode which would require the screen to be removed from the wall if installed.
  • Page 11 LED LIGHTS ATTACHMENT Note: Use caution in the next steps; do not kink or fold the light strip, which will cause damage in the circuit. Use the foam strips provided to losely wrap LEDs around the corners. Press the lights into the channel on the frame. It is necessary to remove the adhesive backer, the LED strips are securely captured in the LED channel.
  • Page 12: Determine Your Material

    DETERMINE YOUR MATERIAL Non – AT Material (Slate, Pure, Short Throw) Refer to page 13 Maestro 2 – White AT Material Refer to page 14 - 15 PVC – AT Material (Slate AT, Pure AT) Refer to page 16 - 17 MATERIAL ATTACHMENT SEQUENCE –...
  • Page 13: Slate, Short Throw, Pure Material Attachment

    SLATE, PURE, SHORT THROW MATERIAL ATTACHMENT Police the area for hardware, tools, or debris before laying out the included foam sheeting. Refer to the Material Rolling diagram at the bottom of page 12 for material orientation when unrolling the screen optic. Gloves must be worn when handling the material to prevent damage or marring of the screen optic.
  • Page 14 MAESTRO 2 – AT MATERIAL (WITH BLACK BACKER) – ATTACHMENT Police the area for hardware, tools, or debris before laying out the included foam sheeting. Refer to the Material Rolling diagram at the bottom of page 12 for material orientation when unrolling the screen optic.
  • Page 15 MAESTRO 2 – AT MATERIAL (WITH BLACK BACKER) – ATTACHMENT Remove and discard the post retention bumpers and distribute the posts along the frame so they align with the holes in the screen’s black tensioning media. Refer to the Material Attachment Sequence diagram on page 12 and begin attaching the material to the posts by slipping the holes in the black tensioning media over the post.
  • Page 16 PVC AT MATERIAL ATTACHMENT (Slate AT, Pure AT) Ensure the screen material is flat and adjust the snap positions if necessary to flatten the screen material. Once all snaps are attached (following the sequence above), flip screen over and make sure that the screen material is flat and taut everywhere. Scan the QR code to the PVC snap attachment video.
  • Page 17 PVC AT MATERIAL ATTACHMENT (Slate AT, Pure AT) Attach the black backer to the inside of the frame through the grommets. Secure with thumb screws. Secure black backer material with provided thumb screws.
  • Page 18: Trim Attachment (Zero Edge And Fixed Frame Trim)

    TRIM ATTACHMENT Trim is installed with the screen facing down following the material installation. Attach the trim by adding the vertical pieces to the frame and the 4 corner brackets into the horizontal trim. Align the horizontal trim as shown and slip the protruding corner post into the vertical trim. Note: Split Frame Trim horizontals should be spliced using the included trim splice bars before installation.
  • Page 19 TRIM ATTACHMENT Push the trim corners flush and hold while tightening the set screws. Add, two per corner, of the ¼-20 x ¼” trim screws and verify corners are flush. Split Frame Only: Connect the horizontals at the middle by installing quantity 4 1/4–20 x 1/4’’ screws trough the trim into the splice bar.
  • Page 20: Wall Mounting

    WALL MOUNTING Brackets should be installed between 6” and 1/3 the width of the screen from the left and right edge. Note: Screens above 133” will use 3 brackets and all brackets should be installed TOP OF VIEWING LEVEL " (9.5 cm) Note: Horizontal frame pieces should be spliced before adding the vertical frames.
  • Page 21 OPTIONAL FLOWN MOUNTING Flown Kit Ceiling Mount should be installed between 6” and 1/3 the width of the screen from the left and right edge. Once placement is determined, anchor the ceiling mount to a joist, beam, or similar support structure. Note: Make sure to drill the holes into a beam that can support the weight of the screen.
  • Page 22: Ip (Zigbee) Controlled Lighting Setup

    IP (ZIGBEE) CONTROLLED LIGHTING SETUP CONNECT TO LED STRIP Controller input voltage must be in accordance with the required voltage of LED strips. Input voltage = Output Voltage Connect to RGB LED strip diagram MOUNTING Free screw when connecting to LED strip ZIGBEE 3.0 APP CONTROL INSTRUCTION Scan this QR code refer to page 2, to get more details.
  • Page 23 IR LIGHTING HEX CODES Scan this QR code to use for different remote control...
  • Page 24 Screen Innovations 9715-B Burnet Rd, Suite 400 Austin, TX 78758 512.832.6939 www.screeninnovations.com 400025 v. 2.3 | December 2023...

This manual is also suitable for:

Zero fixed series

Table of Contents