Solplanet Ai-LB Pro Series Quick Installation Manual

Rechargeable lithium-ion battery system
Hide thumbs Also See for Ai-LB Pro Series:

Advertisement

Quick Links

Rechargeable Lithium-ion Battery System
Ai-LB 5K Pro Quick Installation Guide
Version: 1.5
Doc. No.: PT-Q-231C02
Date: 2023/07/05
© Copyright 2023 Solplanet Limited. All rights reserved. Specifications are subject to change without prior notice.
Solplanet does not accept any responsibility whatsoever for potential errors or possible lack of information in this document.
Before installation, Please read this guide.
1. Read this guide carefully before installation to understand product features and safety precautions.
2. Installers should be well trained to fully understand grid-connected photovoltaic power systems and
national/regional standards.
3. Installers must use insulated tools and wear safety equipment.
4. As required by local regulations,an overcurrent protection and isolation device that operates both positive
and negative conductors simultaneously is required between inverter and battery system and also between
parallel batteries.The cable needs to be prepared by the installer, cable specification: 25mm
cable terminal model: E25-16.
5. Before installation, ensure that battery pack is switched off, and open any associated circuit breakers and
disconnect switches.
1 Handling Precautions and Guidelines for Product
These Handling Precautions and Guidelines for Rechargeable Battery System ("Handling Precautions
and Guidelines") shall only apply to the packs manufactured by AISWEI New Energy Technology (Yangzhong)
Co., Ltd ( hereinafter referred to as "AISWEI" ). Customer shall strictly follow these Handling Precautions and
Guidelines, and shall alert its customers, contract manufacturers, agents, distributors, service providers and
end users of the risks of the packs and shall ensure that Customer's obligations as specified in the Document
as well as the Handling Precautions and Guidelines are, through a printed label on host device, or through
Customer's Quick Installation Guide, or a help file or Customer's Internet website, contractually imposed on
Customer's own customers and distributors, and by them further down to the end users so that the entire
chain is committed to the above obligations and so that the products are properly handled, operated,
transported, used and maintained.
Statement(1) :
Customer is requested to contact AISWEI in advance, if and when the customer needs other applications
or operating conditions than those described in this Document. Additional experimentation may be required
to verify performance and safety under such conditions
Statement (2) :
AISWEI will take no responsibility for any accident or liabilities in the event the Product is used for
applications or under conditions other than those described in this Document.
Use Product under specified charge/discharge conditions.
Do not immerse in water.
Do not heat.
1
2
/ 4 AWG,

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Ai-LB Pro Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Solplanet Ai-LB Pro Series

  • Page 1 © Copyright 2023 Solplanet Limited. All rights reserved. Specifications are subject to change without prior notice. Solplanet does not accept any responsibility whatsoever for potential errors or possible lack of information in this document. Before installation, Please read this guide.
  • Page 2 ⚫ Do not attempt to crush, drop or penetrate the pack. ⚫ Do not attempt to have any modification/. Leave Product in cool places. ⚫ ⚫ Stop using Product with any colour change or mechanical damage detected during assembling, charging, normal operation and storage . ⚫...
  • Page 3: Product Packing List

    ⚫ Read the instructions regarding the installation and operation so as to avoid damages due to incorrect operations. ⚫ The pack may have insufficient power capacity after long storage. ⚫ Knockoff or counterfeit battery. ⚫ Any inconsistency between serial number, model number, and product code. 2 Product Packing List Item Name Details...
  • Page 4: Product Appearance

    Max +55℃ Min -15℃ RH: < 95% 4 Product Appearance Number Name Details Notes Power Switch Red light: ALM, Blue light: RUN INVERTER RJ45 CAN communication to the inverter Internal RS485 communication between LINK IN RJ45 batteries Internal RS485 communication between LINK OUT RJ45 batteries...
  • Page 5: Battery Installation

    WIFI Socket For optional WIFI stick 125A DC Breaker RJ45 Port Pin Definition View Item Description RS485- RS485- CAN- CAN- INVERTER BMS- BMS- BMS- BMS- LINK IN RS485- RS485- CAN-H CAN-L BMS- BMS- BMS- BMS- LINK OUT RS485- RS485- CAN-H CAN-L 5 Installation 5.1 Battery Installation...
  • Page 6: Ground Connection

    5.1.3 1. Fix the "Back Plate (E)" to the wall. 2. Hang the battery on the bracket according to the picture below. 3. Secure the PACK from the side using screws (H). ④ ③ ② ① Remove the shield 5.2 Single Unit Connection INVERTER Note: Before electrical connection, Circuit breakers...
  • Page 7: Power Cable Connection

    ② ③ ① ④ 5.2.3 Power Cable Connection B-2: Positive Cable B-1: Negative Cable 5.2.4 Activate Battery 1. Turn on the circuit breaker while the power switch is off. 2. Turn on Power Switch to start battery. After five seconds, a blue light flashes to indicate normal operation. 3.
  • Page 8: Parallel Communication

    2. Turn off any external DC circuit breaker between inverter and battery or parallel batteries. 3. Turn off the integrated circuit breaker. Power switch Push the circuit breaker lever 5.3 Multi-Unit Connection with Bus-Bars (3-Unit Example) 1. The method of cable connection with a bus-bar will output a power of 3 x 3 kW = 9 kW, and at a state-of- charge (SOC) over 70%, 3 x 5 kW = 15 kW.
  • Page 9 For details about communication wiring follow step 5.2.2. 5.3.3 Power Cable Connection 5.3.4 Activate Battery Bank Please follow step 5.2.4. Make sure all breakers are turned on before pressing the power switches on all batteries. 5.4 Multi-Unit Connection without Bus-Bars (3-Unit Example) 1.
  • Page 10 5.4.3 Power Cable Connection Note: Parallel cable needs to be purchased extra. 5.4.4 Activate Battery Bank Please follow step 5.2.4. Make sure all breakers are turned on before pressing the power switches on all batteries. 6 Manufacturing Cables When Required 6.1 Power Cable 6.1.1 Material List (plug components may be purchased separately from supplier) Plug sub assembly...
  • Page 11: Communication Cable

    6.2 Communication Cable 6.2.1 Battery to Battery Communication Cable Pin definition as below, alternatively a standard straight CAT 5 Ethernet cable can be used. Battery side Battery side 6.2.2 Battery to Inverter Communication Cable Pin definition as below, check the pin definition for your inverter in the document linked in 5.2.2, point 4. Battery side Battery side 7 Other...
  • Page 12 9 Commissioning The battery can operate together with Solplanet inverters as default. Monitoring of the battery status is available via the Solplanet App when installed with a Solplanet inverter. If the battery operate together with the other inverters, please contact Solplanet service.