Indoor Installation - Mosa GE 85 FR-5-RENTAL Use And Maintenance Manual

Table of Contents

Advertisement

5.3

Indoor installation

Important
*
The room where the generating set will be installed must comply with the legislation in force at the
place of installation.
Installation of the generating set indoor must be carried out in accordance with the instructions described.
8
H
10
B
(1)
Generating set
(2)
Auxiliary extractor
(3)
Exhaust pipes
(4)
Exhaust pipe protection and insulation
(5)
Rain cap and anti-intrusion hood
(6)
Air ejection duct
(7)
Platform with insulated foundation
(8)
Air inlet with anti-intrusion mesh
(9)
Entrance door
(10)
Containment step
38
9
A
C
E
1
4
D
Recommended minimum size
(A)
Generating set length + 1000 mm
(B)
Generating set width + 2000 mm
(C)
Generating set width + 200 mm
(D)
Generating set length + 400 mm
(E)
Generating set width + 400 mm
(H)
Generating set height + 1500 mm (Min. 2500
mm)
5. Installation
3
5
7
2
6
D5260270

Advertisement

Table of Contents
loading

Table of Contents