Electrical Preparations - Jacuzzi J-200 Instructions For Preinstallation

Table of Contents

Advertisement

m
The support base must be flat and level in order to
provide uniform support for the weight of the hot
tub; in addition, the base of the hot tub must rest
completely on the floor. Otherwise the front panels
and/or methacrylate shell could be damaged: this
damage is not covered by the warranty.
The support base must hold the hot tub load, taking
into account the "Weight" tables above.
m
Prolonged sun exposure could damage the material
of which is made the spa shell, due to its capacity to
absorb heat (dark colours in particular). Don't leave
the spa to sun exposure without adequate protec-
tion when not in use (cover thermal, gazebo, etc.).
Any damage arising by not following these warn-
ings are not covered by the guarantee.
n
The evaporation of water in the spa may lead to very
high levels of humidity, particularly when the ambi-
ent temperature is high. Natural or forced ventila-
tion will help preserve the users' comfort and reduce
damage caused to the building by humidity.
n
Make sure any paving, furnishings, walls, etc. pres-
ent in areas adjacent to the spa are suitable for use
in the conditions mentioned above.
m
The hot tub must be installed so that any quantities
Jacuzzi Europe S.p.A. © 2023
of water (due to leaks and / or atmospheric events)
are disposed of away from it.
Especially if the hot tub is installed partially (
or fully recessed (
that there is no water stagnation; in this case, it is
also necessary to ensure accessibility to the hot tub
from all sides and the removal of the side panels, in
order to access the electromechanical parts and the
hydromassage jets in case of maintenance and / or
breakdowns.
n
Please see local regulations and/or contact your
local authorities or a professional for information
on fencing and protective barriers (and the relat-
ed lighting and safety systems) to prevent children
from accidentally accessing the hot tub.
Jacuzzi Europe refuses all responsibility for any damage caused by
excessive humidity or by overflowing water. Consult a specialist for
indoor installation.
0
■ (
10, "A" / "B") If you want to install the spa against mul-
tiple walls, a space must be guaranteed for the removal of
the panels and for any maintenance, and access must be
guaranteed to the equipment in the tub compartment.
You can use a garden hose to fill the spa.
m
If the spa is connected, for periodic filling, to the
mains system that supplies drinking water, this con-
nection must be carried out in compliance with the
EN1717 norm, using "AA", "AB" or "AD" anti-pollu-
tion protection procedures. For further information,
we recommend you contact your water supply com-
pany and/or your plumber.
m
ATTENTION: (IEC 60335-1) The pressure of the hy-
draulic system that supplies the equipment must
not exceed 600 kPa (6 bar) and, in case water is sup-
plied through solenoid valve(s) (eg. balance tank)
the pressure must have a minimum value of 35 kPa
(0.35 bar).
m
Where there is a risk of frost, the drainage pipes
must be suitably sloping towards the relevant drain-
age point and be fitted with drainage valves.

Electrical preparations

The installer must use cables with an adequate cross-section,
protected by a sheath and/or with tubes or ducts, with charac-
teristics not inferior to type H 05 VV-F.
The entry of cables into the mini-pool up to the electrical box
0
(
1-6) must be provided at point B or B1, depending on the
customer's installation needs.
Note: The lead sections must take account not only the sys-
19
0
10, "C"), it is necessary to check
Jacuzzi Europe S.p.A. © 2023
0
9)

Advertisement

Table of Contents
loading

This manual is also suitable for:

J-210J-215J-225J-235J-245J-275 ... Show all

Table of Contents