Hitachi Zaxis 850LC-3 Operator's Manual page 255

Hide thumbs Also See for Zaxis 850LC-3:
Table of Contents

Advertisement

Interval(hours)
Daily
Contact surfaces of
flange joints
Welded surfaces on
joints
Every 250 hours
Joint neck
Welded surfaces
on joints
Clamps
NOTE: Refer to the illustrations in Fig.2 for each check point location or for a description of
the abnormality. Use genuine Hitachi parts
Interval(hours)
Every 250 hours
Contact surfaces of
flange joints
Oil cooler
Coupling and
rubber hose
NOTE: Refer to the illustrations in Fig.3 for each check point location.
MAINTENANCE
Table 2. Lines
Check Points
Leak (11)
Leak (12)
Crack (13)
Crack (12)
Missing
Deformation
Loose
Table 3. Oil cooler
Check Points
Leak (14)
Leak (15)
Leak (16)
Abnormalities
Replace
O-ring
and/or
retighten bolts
Replace
Replace
Replace
Replace
Replace
Retighten
Abnormalities
Replace
O-ring
and/or
retighten bolts
Replace
Retighten or
replace
7-43
Remedies
13
13
Remedies
16
12
11
M137-07-001
12
M137-07-007
Fig.2
14
16
14
14
15
M1JB-07-048
Fig.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 850-3Zaxis 870h-3Zaxis 870lch-3

Table of Contents