Swing Bearing - Hitachi Zaxis 850LC-3 Operator's Manual

Hide thumbs Also See for Zaxis 850LC-3:
Table of Contents

Advertisement

Swing Bearing --- every 500 hours
2
WARNING: Lubricating both the swing bearing and
gear and rotating the upperstructure must be done
by one person. Before you lubricate the swing bear-
ing, clear the area of all persons.
Each time you leave the cab
• Lower the bucket to the ground.
• Stop the engine.
• Pull the pilot control shut-off lever to the LOCK po-
sition.
• Use handrails.
1. Park the machine on a level surface.
2. Lower the bucket to the ground.
3. Turn the auto-idle switch off.
IMPORTANT: The turbocharger may be damaged if the en-
gine is not properly shut down.
4. Run the engine at slow idle speed without load for five
minutes.
5. Turn the key switch OFF. Remove the key from the key
switch.
6. Pull the pilot control shut-off lever to the LOCK position.
7. With the upperstructure stationary, apply grease via the
three grease fittings.
8. Start the engine. Raise the bucket several inches off the
ground and rotate the upperstructure 40° (1/9 turn).
9. Lower the bucket to the ground.
10. Repeat the procedure three times, beginning with step 7.
11. Apply grease to the swing bearing until grease can be
seen escaping from the swing bearing seals.
12. Total amount of grease to be applied is approximately 3
to 4 strokes by grease lubricator.
13. Take care not to supply excessive grease.
MAINTENANCE
7-14
M17V-07-009

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 850-3Zaxis 870h-3Zaxis 870lch-3

Table of Contents