Advertisement

Quick Links

D E S I G N A I R C U R T A I N
S T A V O K L I M A
Installation and operation manual
Tubex, Tubex XL model
EN
www.stavoklima.cz
version 0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Tubex and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Stavoklima Tubex

  • Page 1 D E S I G N A I R C U R T A I N S T A V O K L I M A Installation and operation manual Tubex, Tubex XL model www.stavoklima.cz version 0...
  • Page 2: Table Of Contents

    Installation and operation manual Table of Contents Table of Contents ................................2 Unpacking, check after transport or warehousing ......................3 2.1. Unpacking and check .............................. 3 2.2. Storing of the unit, additional transport recommendations ................... 3 2.3. Safety measures ..............................4 Basic information about the unit and its use ........................
  • Page 3: Unpacking, Check After Transport Or Warehousing

    Tubex, Tubex XL design air curtain Unpacking, check after transport or warehousing 2.1. Unpacking and check Carefully check the delivery note attached to the delivery. For components identified as extra accessories in the delivery note (not included in the unit or installed therein), please check completeness to the parcel and perfect condition (usually delivered in a separate box).
  • Page 4: Safety Measures

    Installation and operation manual 2.3. Safety measures The unit has been manufactured in line with the government decrees and Czech standards harmonized with the EU regulations mentioned in the manufacturer’s declaration of conformity. The above mentioned product complies with the following standards: ČSN EN 60335-1 ed.3 ČSN EN 60335-2-30 ed.
  • Page 5: Dimensions Of The Unit

    Tubex, Tubex XL design air curtain Dimensions of the unit Dimension (mm ) Model Tubex Tubex XL Technical changes reserved...
  • Page 6: Mounting Of The Unit - Floor Anchoring

    Installation on the right from the door The door Tubex and Tubex XL unit is designed as a vertical unit with media connection (heating medium and electric connection) of the lower portion of the unit (unless ordered otherwise). A reinforced side wall for anchoring to the floor is located in the lower part of the unit.
  • Page 7 Tubex, Tubex XL design air curtain Ground floor view Refer to Figures below and make preparations on the floor for anchoring side wall. The floor must be final after all construction works, i.e., after tiling, final concreting, and paving or with the final surface finish! Let the connection cables sufficiently long.
  • Page 8: Connection Of The Unit To Heating System

    Installation and operation manual Connection of the unit to heating system Please check all hot water connections for readiness and perfect condition before connecting media to the unit. Furthermore, please check the hot distribution for components or other measures to ensure zero transmission of static, dynamic, and dilatation forces at the input and output neck connections.
  • Page 9: Heat Exchanger Control Using A Valve With Thermostatic Head

    Tubex, Tubex XL design air curtain 6.1. Heat exchanger control using a valve with thermostatic head The thermostatic head for 3-way (TVT) valves is always supplied with the sensor separated (temperature range 25–65 °C) – exhaust air temperature control. Setting of the required closing temperature is made on the head scale (1–5).
  • Page 10: Types Of Controllers And Options For Controlling

    Installation and operation manual Types of controllers and options for controlling 7.1. ECON controller The ECON controllers are intended for control of the fan and electric heater (hot water and electric) with possible connection of external components (door contact, room or exhaust thermostat). These types of basic controls do not allow linking of the controllers (except for Econ DUAL).
  • Page 11: Electric Connection Of The Unit

    Tubex, Tubex XL design air curtain Electric connection of the unit The unit must be protected by a suitable circuit breaker according to its electric parameters – refer to attached electric wiring. Connect the ready-to-install cables to the terminals following the attached electric wiring schemes, make connection check, equipotential bonding, and finally turn the power supply on.
  • Page 12: Commissioning, Starting Of The Unit

    The Tubex and Tubex XL air units are made of quality materials that require no special maintenance. However, we recommend that maintenance in required or shorter (depending on your observations due to operation in a specific application) intervals is carried out for long lifecycle of the unit.
  • Page 13: Troubleshooting

    Tubex, Tubex XL design air curtain Quarterly checks:  Unit positioning and tightening of all bolt connections. Then, check tightening of bolts of exhaust splines,  Heat exchanger space check and remove dirt or foreign objects (use vacuum cleaner for dedusting, or steam for stuck dirt).
  • Page 14: Cleaning/Replacement Of The Filter

    Installation and operation manual Cleaning/replacement of the filter Hot-water units and the units without heating are fitted with an air filter. The filter must be cleaned regularly to ensure the efficiency of the unit and its performance levels. The frequency of cleaning depends on local conditions under which the unit operates –...
  • Page 15: Important Notes

    Tubex, Tubex XL design air curtain Important notes The door units are intended to avoid heat or cold loss, filtration, and heating, or for ventilation in combination with mixing accessories. Other uses are not intended. The manufacturer accepts no liability for damage resulting from use other than intended.
  • Page 16 Installation and operation manual STAVOKLIMA s.r.o. Budějovická 450, 370 01 Homole Tel.: +420 387 001 931 e-mail: info@stavoklima.cz www.stavoklima.cz Technical changes reserved...

This manual is also suitable for:

Tubex xl

Table of Contents