Installation; Notes On Safety For The Installation; Handling; Preliminary Checks - Riello RS 310/EV O2 ULX Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

4

Installation

4.1

Notes on safety for the installation

After carefully cleaning all around the area where the burner is to
be installed, and arranging for the environment to be illuminated
correctly, proceed with the installation operations.
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
DANGER
4.2

Handling

The burner packaging includes a wooden platform, it is therefore
possible to move the burner (still packaged) with a transpallet
truck or fork lift truck.
The handling operations for the burner can be
highly dangerous if not carried out with the great-
est attention: keep any unauthorised people at a
distance; check the integrity and suitableness of
WARNING
the available means of handling.
Check also that the area in which you are working
is empty and that there is an adequate escape
area (i.e. a free, safe area to which you can quick-
ly move if the burner should fall).
When handling, keep the load at not more than
20-25cm from the ground.
4.3

Preliminary checks

Checking the consignment
After removing all the packaging, check the integ-
rity of the contents. In the event of doubt, do not
use the burner; contact the supplier.
CAUTION
The packaging elements (wooden cage or card-
board box, nails, clips, plastic bags, etc.) must not
be abandoned as they are potential sources of
danger and pollution; but should be collected and
disposed of in the appropriate places.
Checking the characteristics of the burner
Check the identification label of the burner, showing:
 the model (A) (Fig. 10) and type of burner (B);
 the year of manufacture, in cryptographic form (C);
 the serial number (D);
 the data for electrical supply and the protection level (E);
 the absorbed electrical power (F);
 the types of gas used and the relative supply pressures (G);
 the data of the burner's minimum and maximum output pos-
sibilities (H) (see Firing rate).
Warning. The burner output must be within the boiler's firing
rate;
 the category of the appliance/countries of destination (I).
Installation
The installation of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
WARNING
Combustion air inside the boiler must be free from
hazardous mixes (e.g.: chloride, fluoride, halo-
gen); if present, it is highly recommended to carry
out cleaning and maintenance more frequently.
DANGER
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
Before proceeding with the installation operations,
carefully clean all around the area where the burn-
er will be installed.
CAUTION
Release the burner from the wooden platform by
removing the bolts/nuts/screws that secure the
burner to the platform.
Handle the burner following the safety standards
and regulations of the laws in force and using the
eyebolts supplied as equipment.
I
A burner label, or any other component, that has
been tampered with, removed or is missing, pre-
vents the definite identification of the burner and
makes any installation or maintenance work diffi-
WARNING
cult.
19
GB
A
D
E
G
G
I
I
20178681
B
C
F
H
H
E
E
Fig. 10
20205511

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs 510/ev o2 ulxS045t2S046t2

Table of Contents