DO NOT POWER UP UNIT UNTIL ALL
FERRITES SUPPLIED ARE CONNECTED.
POWERING THE UNITS WITHOUT FERRITES WILL INVALIDATE THE
• Assemble all the other ferrites around the
pipe
according
configuration specified for the unit.
• Loosely secure each ferrite with plastic
thumb screws and thumb nuts.
• Once the ferrite ring is complete, tighten all
wing nuts until hand tight.
• Do not over tighten as ferrites are
fragile.
• In
accordance
regulations, connect the junction box to the
electrical power supply (87V-240V AC).
• Energise the electrical power supply and
ensure that the Red and Green LED lights
on the unit are glowing brightly.
WARNING
The system must be used as
!
specified. Failure to do so
will prevent correct operation
of device and may impair
safety.
to
the
mechanical
with
local
code
WARRANTY
Thumb screw
Thumb nut
and
Junction
box
87 – 240V
electric
supply
Need help?