Siemens SENTRON 3WL10 Equipment Manual page 160

Hide thumbs Also See for SENTRON 3WL10:
Table of Contents

Advertisement

Mounting broadened front terminals on the guide frame
The broadened front terminals are supplied unmounted with the guide frame.
• Screw the extended front terminals on the guide frame to the unconnected flange and place
the insulating caps on them (see Chapter Mounting connections (Page 155)).
• Screw the broadened front terminals to the extended front terminals.
• Mount the insulation protection before or during the following assembly work in the
switchboard panel (see Chapter Withdrawable breaker: Installing the circuit breaker / guide
frame (Page 164)).
3VA27 molded case circuit breakers & 3WL10 air circuit breakers
Equipment Manual, 10/2023, L1V30499596002-03
Connection and commissioning
5.2 Mounting and connecting the device
159

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentron 3va27

Table of Contents