3.1 Installation Requirements

3.1.1 Pipe Layout Requirements

To ensure the optimal operating condition and longest service life, install the
equipment correctly as required.
Precautions
Layout Requirements
Issue 02 (2022-03-30)
Install the equipment according to the design drawing and reserve space for
maintenance.
The NetCol8000-C supports only side pipe routing and must be installed in an
equipment room with a raised floor.
Thermal insulation measures should be applied to outdoor water pipes to
prevent drainage blockage or insufficient water supply due to freezing.
The equipment top should be sealed during installation (before power-on)
with baffle plates or plastic bags to prevent dust on the top of the equipment
or inside the equipment.
Check whether the environment meets the requirements before installation,
and whether reconstruction is required for routing water pipes and cables and
constructing ventilation pipes.
The equipment room should have good heat insulation, and the walls and
floor should be protected against moisture.
To ensure good ventilation, do not place the equipment in the corner of a
room or at the end of a long and narrow room.
During system operation, all doors and windows of the equipment room
should be closed to reduce the additional load of the smart cooling product.
Install the equipment in a spacious place.
The equipment should be placed as far away from offices as possible, and
noise control measures should be taken.
Copyright © Huawei Technologies Co., Ltd.
3

Installation

3 Installation
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol8000-c190d40edNetcol8000-c190d40ec

Table of Contents