CAUTION!
When installing the appliance ensure optimal heat radiation to maintain the operating
CAUTION!
The wall and the reach of the heat radiation above the worktop must be made of heat-
CAUTION!
To avoid any damage, the sandwich layer and adhesive must resist heat.
1. Unpack the appliance carefully. Dispose of the packaging as described in chapter
.
WASTE MANAGEMENT
2. The appliance may be equipped with the transport-protection. Be very careful and
do not use any aggressive or abrasive detergents to remove residuals of the transport-
protection.
3. Check that the appliance and the power cord are not damaged.
4. Connect the appliance to a dedicated socket only.
5. Do not install the appliance in a place where it may come in contact with water or
rain; otherwise the insulation of the electrical system will be damaged.
6. Connect the appliance to the mains properly.
The worktop must be rectangular and plane and made of heat-resisting material.
Structural elements should not interfere with the installation area.
The installation must meet the safety requirements as well as the legal rules and regu-
lations.
The wall sat the hob should be covered with heat-resistant material, e.g. ceramic tiles.
The power cable must not come into contact with cabinet doors or drawers.
The appliance must be supplied with an adequate flow of fresh air from outside the
cabinet to the base of the hob.
If the hob is installed above an oven, the oven must be equipped with a cooling sys-
tem.
Install a thermal protection below the bottom of the appliance when installing it
above a drawer or a cupboard.
The circuit breaker must be easily accessible.

2.3 Selection of installation equipment / Dimensions

Cut out the installation hole as described on the drawing below. For installation and use,
a minimum of 50 mm space shall be preserved around the hole. The thickness of the work
safety.
resistant materials.