4. Unloading and preparing cabinets

Before you start:
Check the layout drawing for the intended locations of the cabinets.
Measure out and mark the locations of the cabinets on the floor.
Inform customers of any changes to the layout.
Note!
Be careful when lifting and moving cabinets: the cabinets' centre of gravity may be at an unexpected point.
Use rubber pads between the cabinet chassis and forklift forks or pallet jack.
Remove the transport brackets securing the cabinet
feet to the pallet (4 pcs).
Take the line cabinets to their installation position and push them towards each other.
Note!
Use a pallet jack or castors under the cabinet feet for easier manoeuvring.
Note!
Make sure there is a 135 mm gap between the lower back walls of line cabinets.
EN DE ES FR PL RU NL FI SV NO DA EE LT LV
Lift the cabinet off the pallet.
Recycle the pallet and packaging material.