Introduction; Contents Of Delivery - Viessmann Tecto SV5 Installation Manual

Multideck
Hide thumbs Also See for Tecto SV5:
Table of Contents

Advertisement

1. Introduction

Read these instructions carefully.
Tecto SV5 cabinets must be installed and started up in compliance with the manufacturer's instructions and
local instructions and regulations.
Note!
Tecto SV5 cabinets are meant for indoor use only.
Normal ambient conditions must not exceed:
Relative humidity 60 % RH
Ambient temperature +25 °C
Frontal airflow < 0.2 m/s
Note!
No part of this document creates any legally binding obligations to Viessmann Refrigeration Systems.
The contents of this document are subject to change without prior notice.

1.1. Contents of delivery

The delivery contains:
cabinets as specified when placing order
accessory packages as specified when placing order (inside the cabinets)
installation and user manual (one per ordered line of cabinets)
multiplexing kit
DIN 912 / ISO 4762
1 x M8 (40 mm)
3 x M8 (80 mm)
2 x M6 (60 mm)
2 x M6 (100 mm)
DIN 934 / ISO 4032
1 x M6
4 x M8
DIN 933 / ISO 4017
1 x M6 (35 mm)
Metal guide pins,
4 x
Mapa insulating tape,
4 mm x 10 mm, (1 m)
Rectangular washer (M8), 2 x
DIN 522 / ISO 4759-3
4 x M6 (40 mm)
3
Multiplexing kit
DIN 9021/ ISO 7093
DIN 7504-K / ISO 15480
24 x (4.8 x 16 mm)
2 x (6.3 x 70)
Plastic guide pins,
2 x
Exadan expanding insulating tape,
3-15 mm x 18 mm, 1 roll (5 m)
Canopy brace, 2 x
M6 nylock nut, 2 x
Bolt sleeve, Ø 8 mm
2 x
EN DE ES FR PL RU NL FI SV NO DA EE LT LV
4 x M8
2 x M7
2 x M6

Advertisement

Table of Contents
loading

Table of Contents