Endless Pools R200 Pre-Delivery Instructions
Hide thumbs Also See for R200:

Advertisement

Quick Links

Congratulations on your decision to enjoy the finest Aquatic Fitness System available...
Welcome to the growing family of ENDLESS POOLS owners.
Pre-Delivery Instructions
Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the safe, secure,
and timely installation of your system. The following sections are guidelines on how to prepare for delivery and set-up of your new
system. Specifically covered are site selection, delivery access, ground preparation, and electrical requirements.
Remember to carefully review the Owner's Manual that accompanies your system, and to register the system's warranty within 10
days of delivery. These items, along with other valuable information, will be found in the Owner's Package which has been placed in
the equipment compartment of your system, where you will also find its serial number.
Watkins Manufacturing Corporation reserves the right to change features, specifications and design without notification and without
incurring any obligation.
DATE PURCHASED: ____________________________________________
DATE INSTALLED: ______________________________________________
DEALER: ______________________________________________________
ADDRESS: _____________________________________________________
TELEPHONE:
____________________________________________________________________
In most cities and counties, permits will be required for the installation of electrical circuits or the construction of exterior surfaces
(decks and gazebos). In addition, some communities have adopted residential barrier codes which may require fencing and/or self-
closing gates on the property to prevent unsupervised access to a pool (or spa) by children under 5 years of age. Your
Fitness System
may be equipped with a locking cover that meets the ASTM F1346-91 Standard for Safety Covers and as a
result, is usually exempt from most barrier requirements. As a general practice, your local Building Department will inform you of any
applicable barrier requirements at the time a permit is obtained for the installation of an electrical circuit. Your ENDLESS POOLS
dealer can provide information on which permits may be required.
ENDLESS POOLS FITNESS SYSTEMS Pre-Delivery
Aquatic

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the R200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Endless Pools R200

  • Page 1 As a general practice, your local Building Department will inform you of any applicable barrier requirements at the time a permit is obtained for the installation of an electrical circuit. Your ENDLESS POOLS dealer can provide information on which permits may be required.
  • Page 2: Site Selection And Preparation

    RECESSED INSTALLATION If you plan to recess your new Endless Pools Fitness system in a deck, patio, or other hardscape element, there are a few items to consider during the preparation process. Like other installations, it is important to have a solid foundation that will support the Fitness System.
  • Page 3: Delivery Access

    The ENDLESS POOLS delivery personnel will supervise the crane delivery and complete the system installation. NOTE: If your system delivery requires the use of a crane, you may be required to pay for its services at the completion of the delivery.
  • Page 4: Ground Preparation

    As a homeowner, it is your responsibility to provide a suitable, level foundation for your system. Keep in mind that most delivery crews are not equipped to level and prepare system sites. If you are interested in having a concrete slab, your ENDLESS POOLS dealer should be able to suggest a qualified, licensed contractor.
  • Page 5 E550 E700 58” 58” 1.75” ELECTRICAL 7’ 5” CUTOUT MAIN DRAIN 15’ 17’ MAIN DRAIN 1.75 ELECTRICAL CUTOUT 20.5” 14” 14” 7’ 10” 1.75 ELECTRICAL EQUIPMENT COMPARTMENT DOOR CUTOUT Page 5...
  • Page 6 E2000 X2000 58” 7’ 5” 1.75 ELECTRICAL CUTOUT SWIM DRAIN 6” 20’ SPA DRAIN 10’ 9” 8’ 9” 1.75 ELECTRICAL CUTOUT 13” Page 6...
  • Page 7: Electrical Requirements

    Control Box and then complete the wiring connections in the control box. NOTE: Complete step-by-step Installation and Wiring Instructions for all 230 volt ENDLESS POOLS models are included in the Owner’s Manual and with each sub-panel, which can be obtained from your dealer.
  • Page 8 ELECTRICAL REQUIREMENTS E500 / E700 230 VAC, 48A, 60Hz, (FIELD WIRING) MAIN INPUT 230 VAC, 60 Amp CIRCUIT 1 CIRCUIT 2 2-POLE CIRCUIT BREAKER (NON GFCI) #6 AWG WHITE, NEUTRAL L2, HOT, #10 AWG RED #6 AWG GREEN, GROUND L1, HOT, #10 AWG BLUE #6 AWG BLUE, L1 #6 AWG RED, L2 L2, HOT, #10 AWG RED...
  • Page 9: System Specifications

    System Specifications Electrical Requirements R200 12’ 0” 50” 4,000 1,335 66.6 Sq. 40” 1,845 lbs 14,730 lbs 190 lbs. 230 volt, 30 amp single phase Square gallons per square GFCI protected circuit 7’5 Feet foot R500 15’ 0” 50” 4,000 1,785 85.9 Sq.
  • Page 10 SERVICES AVAILABLE FROM YOUR ENDLESS POOL DEALER Service Cost Pre-Delivery site inspection _________ Deliver system to installation site _________ Unwrap system and haul away packaging material _________ Set up & level system _________ Fill the system with water _________ Connect the system to its power source _________ Explain and test the system’s operation •...
  • Page 11 WATKINS MANUFACTURING CORPORATION 1280 Park Center Drive Vista, California 92081 (800) 999-4688 extension 8432 ©2016 Watkins Manufacturing Corporation. SWIMCROSS is a trademark of Watkins Manufacturaring Corporation Part #63084 Rev.T (12/20)

This manual is also suitable for:

X200R500X500E500E550E700 ... Show all

Table of Contents