Congratulations on your decision to enjoy the finest Aquatic Fitness System available...
Welcome to the growing family of ENDLESS POOLS owners.
Pre-Delivery Instructions
Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the safe, secure,
and timely installation of your system. The following sections are guidelines on how to prepare for delivery and set-up of your new
system. Specifically covered are site selection, delivery access, ground preparation, and electrical requirements.
Remember to carefully review the Owner's Manual that accompanies your system, and to register the system's warranty within 10
days of delivery. These items, along with other valuable information, will be found in the Owner's Package which has been placed in
the equipment compartment of your system, where you will also find its serial number.
Watkins Manufacturing Corporation reserves the right to change features, specifications and design without notification and without
incurring any obligation.
DATE PURCHASED: ____________________________________________
DATE INSTALLED: ______________________________________________
DEALER: ______________________________________________________
ADDRESS: _____________________________________________________
TELEPHONE:
____________________________________________________________________
In most cities and counties, permits will be required for the installation of electrical circuits or the construction of exterior surfaces
(decks and gazebos). In addition, some communities have adopted residential barrier codes which may require fencing and/or self-
closing gates on the property to prevent unsupervised access to a pool (or spa) by children under 5 years of age. Your
Fitness System
may be equipped with a locking cover that meets the ASTM F1346-91 Standard for Safety Covers and as a
result, is usually exempt from most barrier requirements. As a general practice, your local Building Department will inform you of any
applicable barrier requirements at the time a permit is obtained for the installation of an electrical circuit. Your ENDLESS POOLS
dealer can provide information on which permits may be required.
ENDLESS POOLS FITNESS SYSTEMS Pre-Delivery
Aquatic

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the X200 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Site Selection and Preparation
Outdoor and Patio Installation
Guidelines for installing the system outdoors or on a patio.
Deck Installation
Requirements for installing the system on a deck.
Indoor Installation
Special considerations for indoor installation, including humidity and ventilation.
Recessed Installation
Considerations for installing the system recessed in a deck or patio.
Delivery Access
Assessing Site Access and Clearance
Checking gate widths, overhead clearance, and path obstructions for system delivery.
Ground Preparation
Foundation Requirements and Leveling
Ensuring a level, reinforced concrete pad or deck capable of supporting the system's weight.
Electrical Requirements
General Electrical Installation Guidelines
Requirements for electricians, subpanels, grounding, and wiring for safe electrical installation.
Wiring Diagram: R200/R500 Models
Electrical wiring schematic for R200 and R500 models.
Wiring Diagram: X200/X500 Models
Electrical wiring schematic for X200 and X500 models.
Wiring Diagram: E500/E700 Models
Electrical wiring schematic for E500 and E700 models.
Wiring Diagram: X2000 Model
Electrical wiring schematic for the X2000 model.
Wiring Diagram: E550/E2000 Models
Electrical wiring schematic for E550 and E2000 models.

Table of Contents