GROUND PREPARATION
A reinforced concrete pad at least six inches thick or a deck that is able to withstand more than 250 lbs. per square foot is required
Aquatic Fitness System
for the
system. Keep in mind that most delivery crews are not equipped to level and prepare system sites.
If you are interested in having a concrete slab, your ENDLESS POOLS dealer should be able to suggest a qualified, licensed
contractor.
NOTE: In order for the system to operate properly and the internal plumbing to drain completely, you must ensure that the system
is level.
R200
X200
MAIN DRAIN
20.5"
14"
EQUIPMENT COMPARTMENT DOOR
1.75" ELECTRICAL
CUTOUT
As a homeowner, it is your responsibility to provide a suitable, level foundation for your
50"
7.5'
12'
1.75" ELECTRICAL
CUTOUT
14"
Page 4
R500
X500
E500
7.5'
MAIN DRAIN
20.5"
14"
EQUIPMENT COMPARTMENT DOOR
1.75" ELECTRICAL
CUTOUT
50"
15'
1.75" ELECTRICAL
CUTOUT
14"
Need help?
Do you have a question about the R200 and is the answer not in the manual?
Questions and answers