2. Install the Lens P.C.B. Unit with Mount Contact Unit and tighten 3 screws (G) in numerical order by using the torque driver
with specified torque.
Screw (G)
①
Lens P.C.B. Unit
① → ② → ③
Screw Order
Torque
6.0 ± 1.0 N ・cm
3. Connect FPCs to 3 connectors of the Lens P.C.B.Unit.
Connector x 3
②
Screw (G) x 3
③
18