Advertisement

Quick Links

Product Manual
Turnstile
Duo

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Turnstile Duo and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for digicon Turnstile Duo

  • Page 1 Product Manual Turnstile...
  • Page 2 Turnstile...
  • Page 3 All rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, translated into any language or computer language in any electronic, magnetic, optical, chemical, manual way, or otherwise, without the express written permission from Digicon S.A. Códe: 069.31.222 Version: 02 - English This manual was elaborated by: Digicon S.A.
  • Page 4: Table Of Contents

    Turnstile Contents: 1. Important instructions ................... 2. Orientations ........................ 3. Introduction ....................... 4. Features of Turnstile Duo ..................5. Turnstile Duo operation ..................6. Installing Duo ......................6.1 Preparing assembly of Duo ................6.2 Drilling device ......................6.3 Lateral assembly with rods or glasses ............
  • Page 5: Important Instructions

    You can see, below, the symbols that will appear in this manual, signaling important moments. It is essential to pay attention to them. TIP: Indicates something Digicon considers important. CAUTION: Indicates a moment of extreme caution when handling the equipment/product ATTENTION: Indicates a moment when your observation skills should be extremely productive.
  • Page 6: Orientations

    Keep this manual for future consultations. Ÿ Digicon reserves its right to alter its products at any moment to adapt them to more Ÿ recent technical advancements. Digicon maintains its right to alter the information contained in this manual without Ÿ...
  • Page 7: Features Of Turnstile Duo

    Highly resistant both indoors and outdoors Robust, safe, and firmly fixed to the floor. Complete integration to access controllers. Ÿ Two rotating axles with Digicon mechanism and control. Ÿ Treatment and finishing hat allow its installation outdoors. Ÿ Last arm rubberized with user protection against impact.
  • Page 8: Turnstile Duo Operation

    Turnstile 5. Turnstile Duo operation In the basic mechanism, Turnstile Duo has bidirectional motorized turning with two 12 V electromagnets for activating the locks and two optic sensors that can provide the signal for activating the electromagnets and to the return of passage.
  • Page 9: Installing Duo

    Turnstile 6.Installing Duo 6.1 Prepare the Turnstile assembly The floor where the turnstile will be fixed must meet the following specifications: a. Dimensions: Direction of flow 2.4m x columns width 1.4m x concrete height 0.1 m; b. Necessary height: 2.4 meters; c.
  • Page 10: Drilling Device

    Turnstile 6.2 Drilling device a. t will be necessary to add cardboard or bubble wrap under the device so not to damage the roof painting when using the drilling demarcations; b. Screw the device (P1) to the turnstile's roof (P1); c.
  • Page 11: Lateral Assembly With Rods Or Glasses

    Turnstile 6.3 Assembly of sides with rods or glass sides Sides with rods: a. Fit the sides (P5) and (P6) so to form an arch; b. Screw the sides using washer (P7) and screw (P8); repeat on the four fixing points (two on the upper part, two on the lower part);...
  • Page 12: Assembling The Arms

    Turnstile 6.4 Assembling central arms a. ix the inner triangle (P9) to one of the arms (P10) using the screw and the spring washer (P11); repeat it for the arm's two fixing points (P10). Fixing this part is done internally in the arms that have no buffer. Do not fasten the screw, simply position it. b.
  • Page 13 Turnstile Base set assembled. Do not fasten it. Upper base set assembled. Do not fasten i Quantity of parts used in this stage: P9 = 2x - Triangle Ÿ P10 = 3x – Central arm Ÿ P11 = 6x - Allen screw M8 x 10 Ÿ...
  • Page 14: Fixing Bearing Rods

    Turnstile Fixing the bearing support Replace the fastener's washer (P21) for the washer (P7) Use the fastener (21); does not accompany the product Place silicone rubber under the bearing; then fix the bearing support (P19) to the central hole, as shown in the image.
  • Page 15: Fixing The Sides

    Turnstile INFORMATION: Perform this assembly wice because the turnstile is double.
  • Page 16: Assembling Stationery Arms

    Turnstile Fixing the stationery arms a. Poisition the arches (P50) and (P51) with the support (P49) b. Fix tem using the screws (P53), aligning the faces of the arches (P50) and (P51) c. Fasten all the screws (P53) d. Position the stationery arms (P52) on both sides e.
  • Page 17: Fixing Stationery Arm

    Turnstile Fixing the stationery arm a. Set the stationery arm (P24) over the flanges and coinciding holes; b. Replace the fastener's washer (P21) by the washer (P7); c. Place the fasteners (P21) in all fixing points; d. Fasten all the screws; e.
  • Page 18: Fixing The Roof

    Turnstile Fixing the roof a. Place the roofs (P1) over the sides (P23 or P48); b. Screw them in place, using in each fixation 2 washers (P7), screw (P26), and nut (P18). Place the screw from the bottom upwards. c. Screw the roofs between themselves using 2 washers (P54) to fix them, screw (P55), and nut (P56).
  • Page 19: Fixing The Coverage

    Turnstile 6.10 Fixing the coverage a. Check the height from the floor to the upper part of the roof (P1) – 2.1 meters with tolerance of 5mm; b. Place the turnstile coverage (P27) over the roof (P1) and the stationery arm (P24); c.
  • Page 20: Fitting The Pivoting Arm

    Turnstile 6.11 Fitting of central pivoting arm Grease the bearing support (P19). (We recommend Molykote -2 Plus grease Fit the central arms assembly (P28) in the bearing support (P19). In this stage, the assembler or mechanic cannot drop the central arms assembly, so we suggest an auxiliary assembler or to tie the central arm to the structure;...
  • Page 21: Fitting The Lock System

    Turnstile 6.12 Fitting of locking system a. Fit the locking system (P29) in the pivoting arm assembly (P28), maintaining the arms' alignment, as seen in the 10th step; fit it in the coverage (P27); b. Fit the locking system (P29) with washer (P30), spring washer (P31), and nut (P32).
  • Page 22: Cable Passage

    Turnstile 6.13 Cable passage a. Pass the power and network cables through a hose (P33); b. Put one of the hose's ends (P33) inside the coverage (P27) and the other end inside the side structure (P23 or P48); c. Inside the coverage (P27), place the clamp (P34) on the hose's end (P33) to avoid it being torn;...
  • Page 23: Turnstile Assembled

    Turnstile 6.15 Turnstile assembled Turnstile with Grid (gray, blue, and stainless steel) 7.Optional Items Power supply This power supply kit was especially designed for the line Turnstiles. Among the main advantages of this optional item, is its adaptation capability to the voltage variations often found in installation sites –...
  • Page 24: Ontrol Board C

    Turnstile Duo's control board was designed to meet most technologies of access control terminals in the market. The controller have mechanical features and layout perfectly suited for the Turnstile Duo's needs and it is one of the best options for the equipment's operation.
  • Page 25 Turnstile Signal Name/Description INPUTS +Vext1 (enables turn through voltage) HAB1 (enables turn through dry contact – from right to left) Vext2 (enables turn through voltage) HAB2 (enables turn through dry contact – from left to right) +12Vdc (available to auxiliary – maximum 500 mA) CLOCK1 (input for reader from left to right) DATA1 (input for reader from left to right) CLOCK2 (input for reader from right to left)
  • Page 26: Inputs

    -The cable of the box sensor ( 9) is provided alongside the collecting box kit (optional). Particularly about the 11 connector, pins 13 and 14: Turnstile Duo can be configured as follows to determine direction passage: Passage direction PROG1 (pin 13)
  • Page 27: Outputs

    110 a 220 Vac ou dc The control board also has inputs for optical sensors ( 11) that monitor rotation without mechanical wear, and two opto-isolated inputs to clear the Turnstile Duo required. 7.2.2 Outputs Duo's board has outputs for return signals, electromagnets, pictogram, Turnstile collecting box, and sound alarm.
  • Page 28 Turnstile Connect the outputs according to the following image: Sound alarm Maximum current: 500mA...
  • Page 29: Configuration Of Control Board - Switch Ds1

    Turnstile Configuration of control board – Switch Ds1 The switch (or dipswitch) 1 allows programming the following actions: -passage direction -Maximum time for turns inputs (relay or pushbutton contact normally open and without input voltage), enabling passage in face of these signals; or inputs (relay or pushbutton contact usually closed and with input voltage), enabling passage in the absence of these signals.
  • Page 30: Serial Communication

    ATTENTION: - Size corresponds to the number of bytes sent (total command bytes: 1). - The protocol communication rate is 115,200 bps. The following table shows the enabling commands that can be sent to Turnstile Duo: HEXA ASCII FUNCTION 0x48...
  • Page 31: Orientation Pictogram Kit

    Turnstile Orientation pictogram kit The orientation pictogram kit also visually signals passage direction (through green arrows) and its blockage (red arrows), but in the front/side of the Duo. ATTENTION: The power supply does not have a ground wire. Grounding must be done directly in the turnstile, suing the fixing screw of the board's support.
  • Page 32: Powering Up Duo

    In this condition, Duo is ready for use. ATTENTION: The items mentioned before concern the Digicon Firmware. If the equipment has another firmware, consult the manufactuer/developer to know about the signals presented during the application's initialization .
  • Page 33 Turnstile Configuration mode of in the fixed network (1) or (2) DHCP IP FIXO DHCP If the choice is fixed: Device in the format XXX XXX XXX XXX . Example: if the is 10.10.5.120, inform "010.010.005.120"; IP Address 000.000.000.000 Subnet mask Net mask 000.000.000.000 Network Gateway...
  • Page 34 Turnstile Communication door. Server door 00000 Confirmation of configurations, being (1) e (2) Cancel. 2- Cancel When configurations are finished, the following message will appear BLOCKED 21/02/13 14:57 : INFORMATION: When the message is BLOCKED , it means that a configuration is missing or a blocking command was sent.
  • Page 35: Maintenance

    Turnstile 9. Maintenance: 9.1Preventive and corrective routine maintenance Sphere base – Periodicity: every 700,000 cycles The wear of the spheres' track must be checked Corrective actions: 1. In case of excessive wear (chipping, perforations, fillings or grooves where the sphere turns) replace the part. 2.
  • Page 36 Turnstile Corrective actions: 1. if you spot an incorrect resistance, a short-circuit or open electromagnet, replace it. 2. if the electromagnet is not working, check the board or the voltage 3. if the electromagnet is moving, fasten the base screws. Electromagnets adjustments (if necessary) 1.
  • Page 37: Defects, Causes, And Solutions

    Turnstile Defect, causes, and solutions DEFECT CAUSES SOLUTIONS The power supply's input Check the cables and Ÿ Ÿ cable is not connected It will not turn on the fuse (fuse: 3 A) Ÿ properly The fuse of the power Ÿ supply is blown Perform the preventive Ÿ...
  • Page 38: Dimensions

    Turnstile Dimensions: Frontal View 2260(88,976") 1125(44,291") Upper View 2260 (88,976") 1500(59,055") INFORMATION: Measures informed in this manual are given in millimeters and inches.
  • Page 39 Turnstile Side View 1350 (53,149") INFORMATION: All measures presented in the images are in millimeters and inches.
  • Page 40: Other Information

    Turnstile Other information Gross weight Approx. 590kg (including package) Distance between arms 120 degrees Electromagnets’ power 12 V and 2 A supply Sensors’ power supply 5 V and 0.5 A Package 2340mm X 1080mm X 700mm Power supply Input: 100 Vac to 240 Vac Output: 12,0 Vac 5% / 3 A Dimensions: 35 x 51 x 105 mm Distance between holes: 43 x 98 mm...
  • Page 41: Warranty And Technical Assistance

    Turnstile 10.Warranty and technical assistance Digicon is responsible for the project, skilled labor, and quality of the materials used in the manufacturing of our products, ensuring that the equipment and all parts are free of manufacturing defects or problems. Digicon commits itself to replace or repair, as we choose, any part or equipment presenting manufacturing defects without any costs to the buyer, in our factory in Gravataí...
  • Page 42 Factory, Technical Assistance and Sales Address: Rua Nissin Castiel, 640 - Distrito Industrial. Gravataí/ RS CEP 94045-420 Sales: 55-51-3489-8700/ 3489-8745 Technical Assistance: 55-51-3489-8903 Email: vendas.acesso@digicon.com.br Branch/ SP Development, Technical Assistance and Sales Address: Rua São Paulo, 82 - Alphaville. Barueri/ SP CEP 06465-130 Phone: 55-ll-3738-3500 Email: vendas.acesso@digicon.com.br...

Table of Contents