LINOVISION POE-SW806GM-Solar User Manual page 4

Table of Contents

Advertisement

Warning:If the battery type is configured on web management page of the switch, the
battery type switch is invalid.
When you need to configure the battery type via the DIP button on the switch, please
ensure that the power of the device is turned off; turn on the power of the device after
the configuration is complete.
The above recommendations are for reference only. Select the solar panel based on the
actual open circuit voltage of the battery, the typical work voltage of the solar panel is
higher than the open circuit voltage of the battery.
If you accidentally configure the wrong power parameters in the GUI and cause the
device to power off, press the fourth button of the DIP button, dial up and down 5
times, and all the lights will flash once to restore.
Step
2: Connect Battery
Make connections according to the figure above, and choose the correct battery type according
to the figure below.
In parallel for 12V battery
12V 100Ah + 12V 100Ah=12V 200Ah
In series for 12V battery
12V 100Ah + 12V 100Ah=24V 100Ah

Advertisement

Table of Contents
loading

Related Products for LINOVISION POE-SW806GM-Solar

Table of Contents