Hardware Installation - LINOVISION POE-SW806GM-Solar User Manual

Table of Contents

Advertisement

Hardware Installation

Please follow these steps to setup this Solar PoE Switch.
1> Configure DIP Switch
2> Connect Battery
3> Connect Solar Panel
4> Connect external DC input for UPS power application– Skip this step if you do not use it
5> Connect PoE devices and wireless bridges
Step
1: Configure DIP Switch
Make sure to set correct battery type, voltage, and solar panel type. Otherwise, the
system will not work properly or damaged.
Battery Type
12V Lead Acid
Battery
24V Lead Acid
Battery
12V Lithium
Battery
12V Lithium
Battery
14.8V LiFePO4
Lithium
Battery
24V Lithium
Battery
29.6V LiFePO4
Lithium
Battery
Solar Panel
Switch 1
Type
12V solar
OFF
panel
24V solar
OFF
panel
12V solar
ON
panel
24V solar
ON
panel
12V/18V solar
ON
panel
24V solar
ON
panel
24V/36V solar
ON
panel
Switch 2
Switch 3
ON/OFF
OFF
( invalid)
ON/OFF
ON
(invalid)
OFF
OFF
OFF
OFF
OFF
ON
ON
OFF
ON
ON
Switch 4
Panel
OFF
OFF
OFF
ON
OFF
OFF
OFF

Advertisement

Table of Contents
loading

Table of Contents