Installation - Philips Dynalite DMC2 Installation Manual

Hide thumbs Also See for Dynalite DMC2:
Table of Contents

Advertisement

2

Installation

The DMC2 enclosure and modules are shipped separately and assembled onsite. This
section describes the requirements and procedure for mounting and assembly.
Installation Overview
1. Confirm that all installation requirements are met
2. Remove knockout plates for cabling
3. Mount enclosure
4. Install modules
5. Connect cabling
6. Energize and test unit
2.1
Important Information
WARNING: Isolate from mains supply before terminating or adjusting any terminals. No
serviceable parts inside. Service by qualified personnel only.
We recommend that you read this entire document prior to commencement of installation.
Do not energize the DMC until all the installation steps detailed in this chapter are
complete.
Installation of the home and building automation and control system shall comply with
HD60364-4-41 where applicable.
Once assembled, powered and terminated correctly, this device will operate in basic mode.
A new Philips Dynalite user interface on the same network will turn all output lighting
channels on from button 1 and off from button 4 allowing testing of network cables and
terminations. Advanced functions and custom presets can then be configured via the System
Builder commissioning software.
If commissioning services are required, contact your local distributor for details.
This device should only be operated from the type of supply specified on installed modules.
This device must be earthed.
Do not Megger test any circuitry connected to the dimming system, as damage to the
electronics may result.
WARNING: The DMC must be de-energized before terminating the control and data
cables.
DMC2
13
January 15, 2019
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynalite dmc2-ul

Table of Contents