Installation
Step 14
Connect the AC cables.
Step 15
Install the insulation plate
removed in step 10.
Step 16
Connect the communication cables.
To EMS Meter Port
Note: The cable harness must be passed through the
cable tie which is installed on the insulation plate. Then,
tighten the cable tie.