Download Print this page

Mitsubishi Electric RH-6FHM-SE Series Instruction Manual page 97

Industrial robot

Advertisement

5 Maintenance and Inspection
9) When the maintenance forecast function is valid, reset the accumulation data about the belt. Reset by the
dedicated screen or parameter MFBRST of RT ToolBox2. Refer to "Instruction Manual/RT ToolBox2 User's
Manual" for operation of RT2 and refer to "Instruction Manual/Detailed Explanation of Functions and
Operations" for the parameter.
This completes replacement of the J3 axis timing belt.
Maintenance and inspection procedures
5-86

Advertisement

loading

This manual is also suitable for:

Rh-12fhm-se seriesRh-20fhm-se series