Mitsubishi Electric MXZ-2F33VF4-E1 Service Manual page 236

Table of Contents

Advertisement

OPERATING PROCEDURE
5. Removing the expansion valve
(1) Remove the service panel and the top panel (Refer to
section 1).
(2) Disconnect the power supply cord and indoor/outdoor
connecting wire.
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the LEV coils.
(4) Detach the brazed parts of expansion valves and pipes.
© Copyright 2018 MITSUBISHI ELECTRIC CORPORATION
Issued: Dec. 2022. No.OBH790 REVISED EDITION-L
Issued: Jun. 2022. No.OBH790 REVISED EDITION-K
Issued: Jun. 2021. No.OBH790 REVISED EDITION-J
Issued: Mar. 2021. No.OBH790 REVISED EDITION-H
Issued: Feb. 2021. No.OBH790 REVISED EDITION-G
Issued: Jul. 2020. No.OBH790 REVISED EDITION-F
Issued: Mar. 2020. No.OBH790 REVISED EDITION-E
Issued: Nov. 2019. No.OBH790 REVISED EDITION-D
Issued: May 2019. No.OBH790 REVISED EDITION-C
Issued: Feb. 2019. No.OBH790 REVISED EDITION-B
Issued: Sep. 2018. No.OBH790 REVISED EDITION-A
Published: Mar. 2018. No.OBH790
Made in Japan
HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
PHOTOS/FIGURES
Terminal cover and
Photo 11
the thermal protector (VF2 only)
Compressor nuts
Specifications are subject to change without notice.
236
Discharge pipe
brazed part
Suction pipe
brazed part
LEV coils
Expansion
valves

Advertisement

Table of Contents
loading

Table of Contents