Mitsubishi Electric MXZ-2F33VF4-E1 Service Manual page 229

Table of Contents

Advertisement

13-5. MXZ-4F83VFHZ
NOTE: Turn OFF the power supply before disassembly.
OPERATING PROCEDURE
1. Removing the panels
(1) Remove the screws fixing the service panel, and remove
the service panel.
(2) Remove the screws fixing the top panel, remove the top
panel.
(3) Disconnect the power supply and indoor/outdoor connect-
ing wire.
(4) Remove the screws fixing the front panel, and remove the
front panel.
(5) Remove the screws fixing the back panel, and remove the
back panel.
Photo 3
Screws of the front panel
OBH790L
MXZ-4F83VFHZ2
PHOTOS/FIGURES
Photo 1
Screws of the top panel
Screws of the front panel
Photo 2
Screws of the back panel
229
Screws of the service panel
Screws of the top panel

Advertisement

Table of Contents
loading

Table of Contents